Laserfiche WebLink
Fulton Street Pedestrian Bicycle Corridor PROPOSAL: BID ITEM TABLE <br />FEDERAL AID # TAP-0420(026) <br />PW# 3785 September 6, 2024 <br />Note: Unit prices for all items, all extensions, and the total amount bid must be shown. Where conflict occurs between the <br />unit price and the total amount named for any item, the unit price shall prevail, and totals shall be corrected to conform <br />thereto. All entries must be typed or entered in ink. <br /> <br />BID SCHEDULES, FULTON STREET PEDESTRIAN BICYCLE CORRIDOR WO# 3785 <br /> BIDDER:____________________________ <br />Item <br />No. <br />Item <br />Description Unit Bid <br />Qty <br />Unit <br />Cost Total <br />1 Mobilization 10% L.S. 1.0 $_______.___ $_______.___ <br />2 REMOVING PLASTIC LINE LF 1201 $_______.___ $_______.___ <br />3 REMOVING PLASTIC TRAFFIC MARKING EA 3 $_______.___ $_______.___ <br />4 REMOVING PLASTIC CROSSWALK LINE SF 720 $_______.___ $_______.___ <br />5 ROADWAY EXCAVATION, INCL. HAUL CY 72 $_______.___ $_______.___ <br />6 CRUSH SURFACING BASE COURSE TON 177 $_______.___ $_______.___ <br />7 GRAVEL BORROW INCL HAUL TON 19 $_______.___ $_______.___ <br />8 REPLACE CEMENT CONCRETE PANEL SY 353 $_______.___ $_______.___ <br />9 SAWCUT CONCRETE LF 35 $_______.___ $_______.___ <br />10 SAWCUT ASPHALT LF 473 $_______.___ $_______.___ <br />11 Planing Bituminous Pavement SY 1,299 $_______.___ $_______.___ <br />12 HMA Class 1/2 inch, PG 64-22 TON 135 $_______.___ $_______.___ <br />13 INLET PROTECTION EA 4 $_______.___ $_______.___ <br />14 TOPSOIL TYPE A SY 64 $_______.___ $_______.___ <br />15 SOD INSTALLATION SY 64 $_______.___ $_______.___ <br />16 STREET CLEANING HR 140 $_______.___ $_______.___ <br />17 SPCC PLAN LS 1 $____500.___ $_____500.___ <br />18 CEMENT CONC. TRAFFIC CURB Type E-1 LF 450 $_______.___ $_______.___ <br />19 PLASTIC LINE LF 520 $_______.___ $_______.___ <br />20 WIDE LINE LF 1,934 $_______.___ $_______.___ <br />21 24" PLASTIC CROSSWALK LINE SF 720 $_______.___ $_______.___ <br />22 24" PLASTIC STOP LINE LF 92 $_______.___ $_______.___ <br />23 PLASTIC TRAFFIC SHARO STRAIGHT EA 2 $_______.___ $_______.___ <br />24 PLASTIC BICYCLE LANE SYMBOL EA 10 $_______.___ $_______.___ <br />25 PLASTIC BICYCLE LANE SYMBOL (STRAIGHT) EA 1 $_______.___ $_______.___ <br />26 PLASTIC BICYCLE DETECTOR SYMBOL EA 3 $_______.___ $_______.___ <br />27 <br />PLASTIC BICYCLE LANE LEFT/RIGHT TURN <br />ARROW (WHITE) EA 1 $_______.___ $_______.___ <br />28 <br />PLASTIC BIKE LANE EXTENTION LINE (GREEN <br />AND WHITE) SF 216 $_______.___ $_______.___ <br />29 PROJECT TEMPORARY TRAFFIC CONTROL LS 1 $__27,500.___ $___27,500.__ <br />30 TRAFFIC SIGNAL SYSTEM VIDEO EA 3 $_______.___ $_______.___ <br />31 PERMANENT SIGNING LS 1 $__5,250.___ $__ 5,250.___ <br />32 ADA FEATURES SURVEYING LS 1 $__5,000.___ $___5,000.__