My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthwork Solutions, LLC 1/30/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Earthwork Solutions, LLC 1/30/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 1:40:20 PM
Creation date
2/4/2025 1:26:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthwork Solutions, LLC
Approval Date
1/30/2025
Council Approval Date
9/11/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
FULTON STREET PEDESTRIAN BICYCLE CORRIDOR
Public Works WO Number
3785
Tracking Number
0004652
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
APWA-WA Division 1 Committee rev. 1/8/2016 <br /> <br /> <br /> <br />Proposal for Incorporating Recycled Materials into the Project <br />In compliance with a new law that went into effect January 1, 2016 (SHB1695), the Bidder shall <br />propose below, the total percent of construction aggregate and concrete materials to be <br />incorporated into the Project that are recycled materials. Calculated percentages must be within <br />the amounts allowed in Section 9-03.21(1)E, Table on Maximum Allowable Percent (By Weight) <br />of Recycled Material, of the Standard Specifications. <br />Proposed total percentage: _____________________________ percent. <br />Note: Use of recycled materials is highly encouraged within the limits shown above, but does <br />not constitute a Bidder Preference, and will not affect the determination of award, unless two or <br />more lowest responsive Bid totals are exactly equal, in which case proposed recycling <br />percentages will be used as a tie-breaker, per the APWA GSP in Section 1-03.1 of the Special <br />Provisions. Regardless, the Bidder’s stated proposed percentages will become a goal the <br />Contractor should do its best to accomplish. Bidders will be required to report on recycled <br />materials actually incorporated into the Project, in accordance with the APWA GSP in Section <br />1-06.6 of the Special Provisions. <br /> <br />Bidder: <br />Signature of Authorized Official: <br />Date: <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.