My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthwork Solutions, LLC 1/30/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Earthwork Solutions, LLC 1/30/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 1:40:20 PM
Creation date
2/4/2025 1:26:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthwork Solutions, LLC
Approval Date
1/30/2025
Council Approval Date
9/11/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
FULTON STREET PEDESTRIAN BICYCLE CORRIDOR
Public Works WO Number
3785
Tracking Number
0004652
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Benefit Code Key – Effective 8/1/2024 thru 3/4/2025 <br />15 | P a g e <br /> <br />Note Codes <br /> <br />8. D. Workers working with supplied air on hazmat projects receive an additional $1.00 per hour. <br /> <br /> L. Workers on hazmat projects receive additional hourly premiums as follows -Level A: $0.75, Level B: $0.50, And <br />Level C: $0.25. <br /> <br />M. Workers on hazmat projects receive additional hourly premiums as follows: Levels A & B: $1.00, Levels C & D: <br />$0.50. <br /> <br /> N. Workers on hazmat projects receive additional hourly premiums as follows -Level A: $1.00, Level B: $0.75, Level <br />C: $0.50, And Level D: $0.25. <br /> <br /> <br /> S. Effective August 31, 2012 – A Traffic Control Supervisor shall be present on the project whenever flaggin g or spotting <br />or other traffic control labor is being utilized. Flaggers and Spotters shall be posted where shown on approved Traffic <br />Control Plans or where directed by the Engineer. All flaggers and spotters shall possess a current flagging card issued <br />by the State of Washington, Oregon, Montana, or Idaho. This classification is only effective on or after August 31, <br />2012. <br /> <br /> T. Effective August 31, 2012 – A Traffic Control Laborer performs the setup, maintenance and removal of all temporary <br />traffic control devices and construction signs necessary to control vehicular, bicycle, and pedestrian traffic during <br />construction operations. Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or <br />where directed by the Engineer. All flaggers and spotters shall possess a current flagging card issued by the State of <br />Washington, Oregon, Montana, or Idaho. This classification is only effecti ve on or after August 31, 2012. <br /> <br /> U. Workers on hazmat projects receive additional hourly premiums as follows – Class A Suit: $2.00, Class B Suit: $1.50, <br />And Class C Suit: $1.00. Workers performing underground work receive an additional $0.40 per hour for any and all <br />work performed underground, including operating, servicing and repairing of equipment. The premium for <br />underground work shall be paid for the entire shift worked. Workers who work suspended by a rope or cable receive <br />an additional $0.50 per hour. The premium for work suspended shall be paid for the entire shift worked. Workers who <br />do “pioneer” work (break open a cut, build road, etc.) more than one hundred fifty (150) feet above grade elevation <br />receive an additional $0.50 per hour. <br /> <br />8. V. In addition to the hourly wage and fringe benefits, the following depth and enclosure premiums shall be paid. The <br />premiums are to be calculated for the maximum depth and distance into an enclosure that a diver reaches in a day. <br />The premiums are to be paid one time for the day and are not used in calculating overtime pay. <br /> <br />Depth premiums apply to depths of fifty feet or more. Over 50' to 100' - $2.00 per foot for each foot over 50 feet. Over <br />101' to 150' - $3.00 per foot for each foot over 101 feet. Over 151' to 220' - $4.00 per foot for each foot over 220 feet. <br />Over 221' - $5.00 per foot for each foot over 221 feet. <br /> <br />Enclosure premiums apply when divers enter enclosures (such as pipes or tunnels) where there is no vertical ascent <br />and is measured by the distance travelled from the entrance. 25’ to 300’ - $1.00 per foot from entrance. 300’ to 600’ <br />- $1.50 per foot beginning at 300’. Over 600’ - $2.00 per foot beginning at 600’. <br /> <br />W. Meter Installers work on single phase 120/240V self-contained residential meters. The Lineman/Groundmen rates <br />would apply to meters not fitting this description. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.