My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthwork Solutions, LLC 1/30/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Earthwork Solutions, LLC 1/30/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 1:40:20 PM
Creation date
2/4/2025 1:26:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthwork Solutions, LLC
Approval Date
1/30/2025
Council Approval Date
9/11/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
FULTON STREET PEDESTRIAN BICYCLE CORRIDOR
Public Works WO Number
3785
Tracking Number
0004652
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Benefit Code Key – Effective 8/1/2024 thru 3/4/2025 <br />17 | P a g e <br /> <br />Note Codes Continued <br /> <br /> <br />9. B. The highest pressure registered on the gauge for an accumulated time of more than fifteen (15) minutes durin g the <br />shift shall be used in determining the scale paid. <br /> <br />Tide Work: When employees are called out between the hours of 6:00 p.m. and 6:00 a.m. to work on tide work (work <br />located in the tide plane) all time worked shall be at one and one-half times the hourly rate of pay. Swinging <br />Stage/Boatswains Chair: Employees working on a swinging stage or boatswains chair or under conditions that require <br />them to be tied off to allow their hands to be free shall receive seventy -five cents ($0.75) per hour above the <br />classification rate. <br /> <br /> C. Tide Work: When employees are called out between the hours of 6:00 p.m. and 6:00 a.m. to work on tide work (work <br />located in the tide plane) all time worked shall be at one and one-half times the hourly rate of pay. Swinging <br />Stage/Boatswains Chair: Employees working on a swinging stage or boatswains chair or under conditions that require <br />them to be tied off to allow their hands to be free shall receive seventy -five cents ($0.75) per hour above the <br />classification rate. <br /> <br />Effecti ve August 31, 2012 – A Traffic Control Supervisor shall be present on the project whenever flagging or spotting <br />or other traffic control labor is being utilized. A Traffic Control Laborer performs the setup, maintenance and removal <br />of all temporary traffic control devices and construction signs necessary to control vehicular, bicycle, and pedestrian <br />traffic during construction operations. Flaggers and Spotters shall be posted where shown on approved Traffic Control <br />Plans or where directed by the Engineer. All flaggers and spotters shall possess a current flagging card issued by the <br />State of Washington, Oregon, Montana, or Idaho. These classifications are only effective on or after August 31, 2012. <br /> <br /> D. Industrial Painter wages are required for painting within industrial facilities such as treatment plants, pipelines, <br />towers, dams, bridges, power generation facilities and manufacturing facilities such as chemical plants, etc., or <br />anywhere abrasive blasting is necessary to prepare surfaces, or hazardous materi als encapsulation is required. <br /> <br /> E. Heavy Construction includes construction, repair, alteration or additions to the production, fabrication or <br />manufacturing portions of industrial or manufacturing plants, hydroelectric or nuclear power plants and atomic <br />reactor construction. Workers on hazmat projects receive additional hourly premiums as follows -Level A: $1.00, <br />Level B: $0.75, Level C: $0.50, And Level D: $0.25. <br /> <br /> F. Industrial Painter wages are required for painting within industrial facilities such as treatment plants, pipelines, <br />towers, dams, power generation facilities and manufacturing facilities such as chemical plants, etc., or anywhere <br />abrasive blasting is necessary to prepare surfaces, or hazardous materials encapsul ation is required. <br /> <br /> H. One (1) person crew shall consist of a Party Chief. (Total Station or similar one (1) person survey system). Two (2) <br />person survey party shall consist of a least a Party Chief and a Chain Person. Three (3) person survey party shall <br />consist of at least a Party Chief, an Instrument Person, and a Chain Person. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.