My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthwork Solutions, LLC 1/30/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Earthwork Solutions, LLC 1/30/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 1:40:20 PM
Creation date
2/4/2025 1:26:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthwork Solutions, LLC
Approval Date
1/30/2025
Council Approval Date
9/11/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
FULTON STREET PEDESTRIAN BICYCLE CORRIDOR
Public Works WO Number
3785
Tracking Number
0004652
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Washington State Department of Labor and Industries Policy Statement (Regarding the Production of "Standard" or "Non-standard" Items) <br />Below is the department's (State L&I's) list of criteria to be used in determining whether a <br />prefabricated item is "standard" or "non-standard". For items not appearing on WSDOT's <br />predetermined list, these criteria shall be used by the Contractor (and the Contractor's <br />subcontractors, agents to subcontractors, suppliers, manufacturers, and fabrica tors) to <br />determine coverage under RCW 39.12. The production, in the State of Washington, of <br />non-standard items is covered by RCW 39.12, and the production of standard items is not. <br />The production of any item outside the State of Washington is not covered by RCW 39.12. <br />1. Is the item fabricated for a public works project? If not, it is not subject to RCW 39.12. <br />If it is, go to question 2. <br />2. Is the item fabricated on the public works jobsite? If it is, the work is covered under <br />RCW 39.12. If not, go to question 3. <br />3. Is the item fabricated in an assembly/fabrication plant set up for, and dedicated <br />primarily to, the public works project? If it is, the work is covered by RCW 39.12. If not, <br />go to question 4. <br />4. Does the item require any assembly, cutting, modification or other fabrication by the <br />supplier? If not, the work is not covered by RCW 39.12. If yes, go to question 5. <br />5. Is the prefabricated item intended for the public works project typically an inventory <br />item which could reasonably be sold on the general market? If not, the work is covered <br />by RCW 39.12. If yes, go to question 6. <br />6. Does the specific prefabricated item, generally defined as standard, have any unusual <br />characteristics such as shape, type of material, strength requirements, finish, etc? If yes, <br />the work is covered under RCW 39.12. <br />Any firm with questions regarding the policy, WSDOT's Predetermined List, or for <br />determinations of covered and non-covered workers shall be directed to State L&I at (360) <br />902-5330. <br />Supplemental to Wage Rates <br />8/31/2024 Edition, Published August 2, 2024 <br />1
The URL can be used to link to this page
Your browser does not support the video tag.