My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2930 MAPLE ST 2025-03-27
>
Address Records
>
MAPLE ST
>
2930
>
2930 MAPLE ST 2025-03-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 2:59:34 PM
Creation date
2/6/2025 11:28:38 AM
Metadata
Fields
Template:
Address Document
Street Name
MAPLE ST
Street Number
2930
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
951
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AIRFLOW AI ---H-----I ------H----(ADAIRIFLOW I------------AI AIRFLOVV ----—-- AI AIRFLOW ----—-- AI AIRFLOW ---IAI AIRFLOW -----------@AIRFLOW ------- AI AIRFLOW ----—-- AI AIRIFLOW ----—-- AI AIRFLOW ----—--AAI AIRFLOVV KAISER <br /> PERMANENTE <br /> RAV CAV CAV RAV RAV CAV CAV EAV EAV EAV EAV Project <br /> AO AIRFLOW ------@0 AIRFLOW AO AO Kaiser Permanente Everett <br /> SET-POINT SET-POINT <br /> REHEAT REHEAT REHEAT Medical Clinic Expansion <br /> REHEAT <br /> SET-POINT SET-POINT SET-POINT <br /> SET-POINT i 7----—---@ REHEAT _7-------- SET-POINT AO <br /> SET-POINT I------—--- PI <br /> SET-POINT 2929 PINE STREET CONTROL 1 CONTROL EVERETT,WA 98201 <br /> L-----@LAT L-----8L-AT @LAT L—elLAT <br /> ---------- ---------- <br /> Prepared for <br /> OF DIP KAISER FOUNDATION <br /> HEALTH PLAN, INC. <br /> QALARM <br /> ----------------------- ------—------- <br /> LOCAL LOCAL <br /> BSC HOOD BSC HOOD <br /> lcD QALARM MONITOR MONITO MONITOR <br /> ALARM ALARM <br /> IT T <br /> BSC BSC <br /> ) <br /> GEN.PHARMACY NHD BUFFER ROOM NTEROOM HID ROOM Hellmuth,Obata&Kassabaurn,Inc. <br /> RECV. WRNHZ-LRG NTER-MED WRHZD-MED 1218 Third Avenue,Suite 1315 <br /> -----------------------------------------------—————---------------------------------- Seattle, <br /> ------------------------------------------------ ------------------------------------ <br /> WA 98101 USA <br /> ------------------------------------------------------------------------------------------------------------------------------------------------------------- t+1 206 493 1771 f+1 206 493 1778 <br /> - DIP ------ <br /> All reproduction&—1—t—property right.reserved 0 <br /> 20. <br /> In Association with <br /> NON-HD BUFFER ROOM ANTEROOM HD BUFFER ROOM Mortensen <br /> General Contractor <br /> CONTROLS: CONTROLS: CONTROLS: 10230 NE Points Drive,Suite 300 <br /> 1.THE BAS WILL MODULATE RAV VALVES AND CAV VALVES TO MAINTAIN AIR FLOWS AND POSITIVE PRESSURE 1. BAS WILL MODULATE RAV AND CAV VALVES TO MAINTAIN AIR FLOWS AND REQUIRED PRESSURIZATION SET POINTS AS 1.THE BAS WILL MODULATE EA VALVES AND CAV VALVES TO MAINTAIN AIR FLOWS AND NEG.PRESSURE AS Kirkland,WA 98033 <br /> AS SPECIFIED IN THE ROOM AIR BALANCE SCHEDULE. SPECIFIED IN THE ROOM AIR BALANCE SCHEDULE. SPECIFIED IN THE ROOM AIR BALANCE SCHEDULE. ConXtech,Inc <br /> 2. BAS WILL CONTROL ROOM TEMPERATURE,AND MODULATE THE REHEAT COIL TO MAINTAIN THE REQUIRED 2. BAS WILL CONTROL ROOM TEMPERATURE,AND MODULATE THE REHEAT COIL TO MAINTAIN THE REQUIRED ROOM 2. IN CASE OF ANY BSC HOOD FAILURE,THE BAS WILL MODULATE ROOM EAV TO MAX POSITION TO EXHAUST ALL Structural Fabricator <br /> ROOM TEMPERATURE. TEMPERATURE. ROOM AIR AND TO MAINTAIN THE REQUIRED AIR CHANGES AND PRESSURIZATION. 6701 Koll Center Parkway,Suite 150 <br /> 3. BAS WILL MONITOR ROOM HUMIDITY LEVEL. 3. BAS TO MONITOR ROOM HUMIDITY LEVEL. 3. BAS WILL CONTROL ROOM TEMPERATURE,AND MODULATE THE REHEAT COIL TO MAINTAIN THE REQUIRED Pleasanton,CA 94566 <br /> 4. BAS TO MONITOR DIFFERENTIAL PRESSURE PORTS FOR REMOTE MONITORING OF HEPA FILTERS AT CEILING 4. BAS BAS TO MONITOR DIFFERENTIAL PRESSURE PORTS FOR REMOTE MONITORING OF HEPA FILTERS AT CEILING DIFFUSERS. ROOM TEMPERATURE. KPIFF Consulting Engineers <br /> DIFFUSERS. 4. BAS WILL MONITOR ROOM HUMIDITY LEVEL. CiAl-St—tural Engineering <br /> BAS WILL ALARMS FOR THE FOLLOWING: 1601 Fifth Avenue,Suite 1600 <br /> BAS WILL ALARMS FOR THE FOLLOWING: 5. BAS TO MONITOR DIFFERENTIAL PRESSURE PORTS FOR REMOTE MONITORING OF HEPA FILTERS AT CEILING Seattle,WA 98101 <br /> 1.HIGH DP FOR HEPA FILTER LOADING AT CEILING DIFFUSERS. 1. HIGH DIP FOR HEPA FILTER LOADING AT CEILING DIFFUSERS. DIFFUSERS. <br /> 2. DIFFERENTIAL PRESSURE BETWEEN HD BUFFER AND ANTE ROOM IS OUT OF RANGE(PROVIDE ADJUSTABLE TIME DELAY). BAS WILL ALARM FOR THE FOLLOWING: Mazzetti <br /> 2. DIFFERENTIAL PRESSURE BETWEEN NON-HD BUFFER ROOM AND ANTE ROOM IS OUT OF RANGE(PROVIDE MEP;FP Engineering <br /> ADJUSTABLE TIME DELAY). 3. DIFFERENTIAL PRESSURE BETWEEN ANTE ROOM AND PHARMACY IS OUT OF RANGE(PROVIDE ADJUSTABLE TIME DELAY). 1.PEF-EXHAUST FAN AND VFD GENERAL FAILURE ALARM. 201 4th Avenue,Suite 200 <br /> 3. ROOM TEMPERATURE/ROOM HUMIDITY IS OUT OF RANGE. 4. ROOM TEMPERATURE/HILMIDIFY IS OUT OF RANGE. 2. BSC AIRFLOW OUT OF RANGE OR BSC HOOD FAILURE. Seattle,WA 98121 <br /> 3. HIGH DIP FOR HEPA FILTER LOADING. Key Plan <br /> 4. DIFFERENTIAL PRESSURE BETWEEN HD BUFFER AND ANTE ROOM IS OUT OF RANGE(WITH TIME DELAY). <br /> 5. ROOM TEMPERATURE/HUMIDITY IS OUT OF RANGE. <br /> ALL PHARMACY CONTROL SENSORS,VENTURI VALVE CONTROLLERS,AND PRESSURE MONITORING STATIONS ARE BY ANTEC CONTROLS. RTU-7 OPERATES CONTINUOUSLY TO MAINTAIN TEMPERATURE AND HUMIDITY BASED ON READINGS FROM ANTEC CONTROLS TEMPERATURE AND HUMIDITY SENSORS. <br /> INSTALL ANTEC CONTROLS LCD MONITORS IN ANTEROOM FOR AIR DIFFERENTIAL PRESSURE READINGS BETWEEN HD BUFFER ROOM AND ANTEROOM,AND NHD BUFFER ROOM AND ANTEROOM. <br /> INSTALL MASTER(THREE ROOM CONFIGURATIONS)LCD MONITOR ON WALL IN RECEIVING TO DISPLAY ALL ROOMS OF BEFORE ENTERING ANTEROOM. <br /> INSTALL LCD MONITORS AT 48"AFF. SEE FLOOR PLAN FOR THEIR LOCATIONS. <br /> SEE PHARMACY ROOM AIR BALANCE SCHEDULE FOR FOR AIR CHANGES AND DIFFERENTIAL PRESSURE IN ALL PRESSURE CONTROLLED ROOMS. <br /> t CONTROLS HVAC Professional Seals <br /> NONE <br /> Fe o <br /> 2467 <br /> rs <br /> TONAL <br /> No. Description Data <br /> PACE-- SCHEMATIC DESIGN 2020101124 <br /> DESIGN DEVELOPMENT 2020105115 <br /> IXTEC_.��. —.7r---------—------- DESIGN DEVELOPMENT ADDENDUM 2020106/08 <br /> --------------- <br /> 50%CONTRACT DOCUMENTS 2020/07/31 <br /> 75%CONTRACT DOCUMENTS 2020/09/25 <br /> —-------- PERMIT SET 2020/11/13 <br /> ISSUED FOR CONSTRUCTION 2021/03/19 <br /> ---------—---------------—--------- --- <br /> "N'-- ---------------- ------------------------ <br /> - <br /> --—---—--—--—------------ <br /> -- ---—------------- ---——------ rp W--------- <br /> ----E. IHIH <br /> r h <br /> H <br /> ---------------------=- <br /> T1 <br /> J_ <br /> 0 <br /> a— A AC000094-2 AC-TYP-MW <br /> Acontrols lxw.trols <br /> KIP Project No CAP020407 <br /> HOK Project No 19.05002.03 <br /> Sheet Title <br /> 3 CONTROLS ANTEC CONTROLLERS r2 CONTROLS ANTEC CONTROL LCD MONITOR HVAC CONTROLS <br /> NONE M618 NONE <br /> tL <br /> tL <br /> E <br /> Original is 30.—D.not scaly contents or tdrawing. <br /> Sheet Number <br /> M618_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.