My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2930 MAPLE ST 2025-03-27
>
Address Records
>
MAPLE ST
>
2930
>
2930 MAPLE ST 2025-03-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 2:59:34 PM
Creation date
2/6/2025 11:28:38 AM
Metadata
Fields
Template:
Address Document
Street Name
MAPLE ST
Street Number
2930
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
951
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> KAER <br /> PER ANENTE <br /> Project <br /> Kaiser Permanente Everett <br /> Medical Clinic Expansion <br /> 2929 PINE STREET <br /> EVERETT,WA 98201 <br /> DEDICATED BACNET IP SUBNETS TO EQUIPMENT CONTROLLER Prepared for <br /> KAISER FOUNDATION <br /> Lj HEALTH PLAN, INC. <br /> Lj <br /> j MRI EQ TER TER VRF VRF ELEV IDU HRP-1 <br /> j CHL-1 ODUA ODU-2 ODU3 ODU-4 ODU-5 <br /> �j <br /> Oi 0 0 0 0 0 0 0 0 0 0 0 0 0 0 <br /> I <br /> PHARMACY PHARMACY 13/14 W 13I14 E PHARMACY PHARMACY 1314 E 13I14 C 13/14 W L2 OR OR 11I12 L2 L2 Ll -1 ISO ELEV <br /> LEVEL 5-ROOF PEF-1 PEF-2 EF-1 EF-2 RTU-7 H RTU-7 RTUS RTU-5 RTU4 RTU3 H RTU-3 EHR-1 RTU-2 H RTU-2 RTU-1 H RTU-1 EF-7A,B IDU-16 LEVEL 5-ROOF <br /> L— DEDICATED BACNET IP SUBNETS TO EQUIPMENT CONTROLLER , <br /> r-----y-------j <br /> F --//------- - - <br /> ----j <br /> TYPICAL OF VAVICAV <br /> TT CONTROLLERS, <br /> HW COIL CONTROL VALVES, <br /> EMERGENCY SEE PLANS FOR QUANTITIES <br /> 120V VAV-z ZONE VAV-x ZONE O L4 ELECTRIC PHARMACY L4 MED L4 MED L4 TR L4 TR L4 ELECTR <br /> KPIT MANAGED SWITCH CONTROLLER CONTROLLER 5 DUCT BIOSAFETY IDU-14 IDU-15 IDU-12 IDU-13 METERS Hellmuth,Obata&Kassabaum,Inc. <br /> O (TYP.)Oq (TYPO HUMIDIFIER CABINETS AT PANELS 1218 Third Avenue,Suite 1315 <br /> O1 3 O TYPICAL OF TYP;ROLLER O Seattle,WA 98101 USA <br /> SEE PLANS FOR QUANTITIES t+1 206 493 1771 f+1 206 493 1778 <br /> LEVEL 4 LEVEL 4 Alel e roauction&imalectual Property right.reser,.ea <br /> In Association with <br /> — DEDICATED BACNET IP SUBNETS TO EQUIPMENT CONTROLLER —7 —7 —-1 —-1 —7 <br /> r-----y�------j <br /> y/_____j �_ �-r_____ ortensan <br /> ctor <br /> r r-----yi----j <br /> TYPICAL OF VAVICAV 10230 NEaPoints Drive,Suite 300 <br /> CONTROLLERS, Kirkland,WA 98033 <br /> HW COIL CONTROL VALVES, <br /> IN R R <br /> EMERGENCY SEE PLANS FOR QUANTITIES <br /> 120V j L3 ELECTRIC ID-9 ID-1 ID MED M ELECTR ConXtech,Inc <br /> VAV-z ZONE VAV-x ZONE J/ DUCT IDU-9 IDU-10 IDU-11 METERS <br /> KPIT MANAGED SWITCH O <br /> CONTROLLER CONTROLLER HUMIDIFIER AT PANELS 6701 Structural Fabricator <br /> 150 <br /> (TYP.) 4O (TYP.)O <br /> O O 4 O CONTROLLER o enter Parkway,Suite <br /> TYPICAL OF HUMIDIFIER Pleasanton,CA 94566 <br /> CONTROLLERS, (TYP.) <br /> SEE PLANS FOR QUANTITIES KPFF Consulting Engineers <br /> Civil t Structural Engineering <br /> LEVEL 3 LEVELS 1601 Fifth Avenue,Suite 1600 <br /> Seattle,WA 98101 <br /> r , — DEDICATED BACNET IP SUBNETS TO EQUIPMENT CONTROLLER - - - -1 Mazzetti <br /> r— —y�---: — MEP+FP Engineering <br /> 1 1 r-----y/--- --j - r- <br /> KPIT ANALYTICS r �/ A 2013 4th Avenue,Suite 200 <br /> r-----y/----j Sea Is WA 98121 <br /> L L CONITROLLERS,VAVICAV <br /> HW COIL CONTROL VALVES, <br /> EMERGENCY SEE PLANS FOR QUANTITIES LAB GROSS. L2 L2 L2 ELECTR Key Plan <br /> 120V VAV-z ZONE VAV-x ZONE 5 STATION EF5 EF-6 METERS <br /> KPIT MANAGED SWITCH CONTROLLER CONTROLLER O <br /> I <br /> O O (TYP.)0 (TYPO HOODS AT PANELS <br /> I 1 <br /> 1 1 LEVEL 2 LEVEL 2 <br /> F———J EXISTING BAS SYSTEM <br /> L— DEDICATED BACNET IP SUBNETS TO EQUIPMENT CONTROLLER F— — 'r— F— <br /> L_________J <br /> 1 1 I 1 1 1 r i <br /> TYPICAL OF VAVICAV <br /> CONTROLLERS, <br /> HW COIL CONTROL VALVES, <br /> r -- EMERGENCY SEE PLANS FOR QUANTITIES <br /> 120V MRI EMG MRI EQ -1 TR -1 HOT L1 ELEV -1 SS -1 NS -1 VEST MED GAS L1 ELECTR <br /> I OVAV-z ZONE VAV-x ZONE O EF-B IDU-7 IDU-B LAB SP-1 CUH-2 CUH-3 CUH4 ALARM METERS Professional Seals <br /> r—— LIGHTING CONTROL HUBS KPIT MANAGED SWITCH CONTROLLER CONTROLLERO <br /> (TYP) <br /> (TYP) EF-3 PANELS AT PANELS <br /> 3 L__ W. <br /> TO LEVEL 1-CANYON O-1 CONF <br /> t,Q4 DF was <br /> 1 1 I I I <br /> RTU-8 ON <br /> r- FA SYSTEM ANNUNC. ROOF OF <br /> LEVELI 24672 <br /> -1C MG -1C EVS L1C MG P5 ROOF P3 TR P1 ELECT <br /> L—————————— UH-G1 EF-9 MANIFOLDS ELEV MACH HP-1 WEF-1 G <br /> LEVEL 1 CONTROLS HP-2 LEVEL 1 loNAL <br /> I <br /> L— DEDICATED BACNET IP SUBNETS TO EQUIPMENT CONTROLLER <br /> No. Description Data <br /> L 1 r y/ SCHEMATIC DESIGN 2020/01/24 <br /> 1 _-__ y/____j DESIGN DEVELOPMENT 2020/06/15 <br /> 3 DESIGN DEVELOPMENT ADDENDUM 2 0 2 010 511 5 <br /> 50%CONTRACT DOCUMENTS 2020/09/25 <br /> 2 50%CONTRACT DOCUMENTS 2020/07/31 <br /> L— O EMERGENCY PERMIT SET 2020/11/13 <br /> J L__________ -- - J ISSUED FOR CONSTRUCTION 2021/03/19 <br /> I I 120V AIR MED VAC MED AIR HW SYSTEM DHW SYSTEM FUEL EMERG BMECH BMECH BELEC BEMRG BTRANSF BTER BTER BTER BTER <br /> KPIT MANAGED SWITCH COMPR PUMP COMPR BOILERS WATER MANAGM GENER IDU-1 IDU-2 IDU-3 ELEC SF-1 IDUl-TER IDU2-TER IDU3-TER IDU4-TER <br /> _ AC-1 MVP-1 MAC-1 AND PUMPS HEATERSAND PANEL PANEL IDU4 <br /> F— EMERGENCY 120V JACE/KPIT MANAGED — 'r— 'r PUMPS 5—— F—ROUTING NETWORK DEDICATED BACNET IP SUBNETS <br /> KPIT VIRTUAL BAS SERVER TO FLOOR DEVICES TYPICAL OF VAVICAV <br /> L J ❑ ❑ CONTROLLERS, <br /> HW COIL CONTROL VALVES, <br /> SEE PLANS FOR QUANTITIES <br /> qO VAV-x ZONE VAV-z ZONE O <br /> r � B IDU-6COMPR. BMECH BTER CONTROLLER CONTROLLER P. O B FS B GEN NATURAL DOMESTIC B ELECTR. ELECTR. <br /> L—— COMR. IDU-6 SP-1 UPS (TYPO UH-2 UH-1 GAS WATER METERS METER <br /> IRRIGATION SYSTEM <br /> WATER METER IDU-5 METERS METERS AT PANELS AT MAIN <br /> L — BASEMENT SWITCHBOARD BASEMENT <br /> OVERALL BAS DIAGRAM <br /> NOTES: <br /> OPROVIDE TEMPORARY NETWORK CABLING FLOOR TO FLOOR TO WHEN A CONTROLLER FOR VAVICAV(SIEMENS DXR <br /> ALLOW TEMPORARY CONNECTIVITY BETWEEN AND AMONG SAS O CONTROLLER)ALLOWS DAISY CHAINED BACNET IP,INSTALL UP <br /> EQUIPMENT CONTROLLERS. TO TEN CONTROLLERS PER LOOP WITH TWO HOME RUNS TO <br /> THE KPIT MANAGED SWITCH.PROVIDE RSTP CAPABLE SWITCH <br /> OINSTALL TEMPORARY BAS WORKSTATION FOR STARTUP,AND TO TAKE ADVANTAGE OF THE ROBUST RING TOPOLOGY. <br /> REMOVE IT ONCE CONNECTIVITY IS ESTABLISHED TO EXISTING <br /> BAS NETWORK AND BAS DATABASE SERVER. O IF SOME MANUFACTURER EQUIPMENT ON THIS DRAWING IS <br /> BACNET MSTP IN LIEU OF BACNET IP,CONNECT THOSE DEVICES <br /> OINSTALL TEMPORARY BAS(UNMANAGED)SWITCHES IN IT VIA DAISY CHAIN TO LAND AT SIEMENS BAS FIELD PANEL <br /> ROOMS FOR STARTUP AND COMMISSIONING ACTIVITIES WHICH CONTROLLERS(PXC)OR BACNET MSTP ROUTERS.EACH PXC <br /> WILL TAKE PLACE AHEAD OF KPIT MANAGED SWITCH CONTROLLER CAN HOST UP TO 50 MSTP DEVICES,IF REQUIRED. <br /> READINESS.BAS NETWORK CABLES TO BE MOVED FROM <br /> TEMPORARY SWITCHES TO PERMANENT KPIT SWITCHES POST O PRO VIDE SPECIFIC UNIQUE CABLE JACKET COLOR FOR BAS AND <br /> STARTUP.ALL WIRES HOME RUN TO THE SAME ROOMS. OTHER FACILITIES IP EQUIPMENT.(PURPLE,ORANGE,ETC.). <br /> THIS WILL PROVIDE EASE OF LOCATION AND ID FOR <br /> OPROVIDE 120V EMERGENCY POWER FOR BAS CONTROLLERS TROUBLESHOOTING OR SERVICE. <br /> (SIEMENS PXCS).PROVIDE BAS 120/24V TRANSFORMERS TO <br /> VAVICAV CONTROLLERS AND OTHER BAS EQUIPMENT(SIEMENS <br /> DXRS). KP Project No: CAP020407 <br /> HOK Project No: 19.05002.03 <br /> Sheet Title: <br /> OVERALL BAS <br /> CONTROLS <br /> a <br /> CONTROLS - OVERALL BAS <br /> M652 NONE origioel i.30><az.Do not.P.io oontente,or t-mewing. <br /> Sheet Number <br /> M652 <br />
The URL can be used to link to this page
Your browser does not support the video tag.