Laserfiche WebLink
Kelsey Siep <br />From: Eric Sweet <esweet@mazzetti.com> <br />Sent: Thursday, July 8, 2021 3:44 PM <br />To: Terri Jorgenson <br />Subject: RE: Kaiser Permanente fuel oil tank <br />I'm not sure if the tank demolition is being reviewed under a separate permit. Let me look into it and get back to you. <br />It will be fully removed and not decommissioned in place. <br />Eric Sweet, PE, CxA, LEED AP <br />Associate Principal I Senior Electrical Engineer <br />MAZZETTI <br />D: 425.712.2188 C: 206.963.2091 <br />www.mazzefti.com <br />From: Terri Jorgenson <TJorgenson@everettwa.gov> <br />Sent: Thursday, July 8, 2021 3:39 PM <br />To: Eric Sweet <esweet@mazzetti.com> <br />Subject: RE: Kaiser Permanente fuel oil tank <br />Is the decommissioning of the existing tank already reviewed under another permit or do we need to include it in this <br />public works permit? Is it being removed or decommissioned in place? <br />— Terri Jorgenson <br />Development Technician I Permit Services <br />425.257.88611 3200 Cedar Street, 2i' Floor, Everett, WA 98201 <br />EVERETT Phone Hours: M-F 8:30am — 3:OOpm <br />everettwa.gov/permits I Facebook I Twitter <br />COVID-19 Update: Please reference our website & online resources for updates to our service during the <br />COVID-19 pandemic. Due to limited staff and increased volumes, response times have increased and may take <br />as long as 3 — 5 business days. Your patience is appreciated as we respond in the order received. Thank you <br />and stay well. <br />Note: Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br />Records Act. <br />From: Eric Sweet <esweet@mazzetti.com> <br />Sent: Tuesday, July 6, 2021 10:47 AM <br />To: Terri Jorgenson <TJorgenson@everettwa.gov> <br />Subject: Kaiser Permanente fuel oil tank <br />I received your voicemail. I tried calling back, but the phone just kept ringing so I was not able to leave a message. Are <br />you reviewing the mechanical plans for the full Specialty Clinic design? I ask because there have been a few enabling <br />projects submitted separately. <br />There is an existing generator and existing underground fuel oil tank serving the existing clinic. The existing tank is being <br />decommissioned and a temporary above grade tank is being installed in the existing parking garage. This work is shown <br />