Laserfiche WebLink
LIZA PELENKO <br /> ADMINISTRATIVE & PROJECT MANAGER <br /> _JVTHE <br /> �n- Poste. <br /> LIZA PELENKO I ADMINISTRATIVE Et PROJECT MANAGER <br /> THE SIGN POST, INC. <br /> P: 360.671.1343 <br /> E: LIZA@THE-SIGNPOST.COM <br /> 2019 E. BAKERVIEW RD. <br /> BELLINGHAM,WA 98226 <br /> M-F I 8:30AM-5:OOPM <br /> WWW.THE-SIGNPOST.COM <br /> W-9 I WORLD SIGN <br /> ASSOCIATES <br /> On Wed,Apr 24, 2024 at 9:19 AM Matt Schreifels<MSchreifels@everettwa.gov>wrote: <br /> Category 2:Sensitive information <br /> Liza, <br /> Yes,you will need to reschedule for the Sign final inspection. Prior to the Sign final you will need to <br /> reschedule for the electrical inspector to come back out to verify the electrical that was running to the <br /> non-conforming sign has been removed per code and then schedule for the sign final. <br /> Thank you, <br /> — Matt Schreifels <br /> Building Inspector I Permit Services <br /> EVERETT <br /> 425.257.8810 13200 Cedar Street, 2"d Floor, Everett, WA 98201 <br /> Phone Hours: M— F: 7:30 a.m.—8:30 a.m. <br />