My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5900 36TH AVE W BRIDGE POINT 2025-04-23
>
Address Records
>
36TH AVE W
>
5900
>
BRIDGE POINT
>
5900 36TH AVE W BRIDGE POINT 2025-04-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2025 2:40:45 PM
Creation date
2/6/2025 11:51:43 AM
Metadata
Fields
Template:
Address Document
Street Name
36TH AVE W
Street Number
5900
Tenant Name
BRIDGE POINT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9/15/23, 12:33 PM Southeast Permits Mail-City of Everett Permit Services:5900 36th Avenue W(S2308-009)-First Building Review <br /> ■��■t���.�z�t projects SE Permits <projects@southeastpermits.com> <br /> n�_r■��i t� <br /> City of Everett Permit Services: 5900 36th Avenue W (S2308-009) - First Building <br /> Review <br /> 2 messages <br /> Drew Martin <dmartin@everettwa.gov> Mon, Sep 11, 2023 at 2:09 PM <br /> To: "projects@southeastpermits.com" <projects@southeastperm its.com> <br /> Category 2:Sensitive information <br /> Hello, Maria. <br /> We have completed the first review of the building plans for this project. This email will serve as the review letter. The <br /> comments below should be addressed. Two revised full-sized hard-copies of the drawings should be submitted for <br /> review. An itemized response letter stating how each comment has been addressed should be included with the <br /> drawing. Additional revised documentation, including but not limited structural calculations and other supporting <br /> documentation, should be submitted as required. <br /> Comments <br /> 1. The project includes a 10-foot tall free-standing sign per Sheet 1. Note"G"states to provide a foundation as <br /> required. The drawings should include a design for the foundation and interior structural supports. The foundation <br /> should be designed for wind loading per ASCE 7-16 Chapter 26. Calculations substantiating the design should be <br /> submitted for review. See IBC Sections 1607.2.1, 1603.1, and 1609.1. <br /> 2. The wall-mounted signs utilize "studs"for the connections. A detail for the connection should be included in the <br /> drawings. The detail should include but is not limited to the type and size (e.g., diameter, etc.), and minimum <br /> embedment. It is anticipated that this is a drilled-in anchor; the detail should specify that the anchor installation <br /> should not damage the wall reinforcement. See IBC Section 1072.1. <br /> Please contact me if you have questions. Thank you. <br /> — Drew Martin, P F c F <br /> City of Everett Permit Review <br /> Associate In City <br /> Status: Approved <br /> WASHINGTON <br /> EVERETT 425.257.8810 10/03/2023 3:46:08 PM <br /> Phone Hours: M/W/T: 8 am - 12 pm & 1 pm—3 pm; Tu: 1:00pm-3:00pm <br /> everettwa.gov/permits I Facebook I Twitter <br /> Note: Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to <br /> the Public Records Act. <br /> https://mail.google.com/mail/u/4/?ik=a099ee2932&view=pt&search=all&permthid=thread-f:1776765636484187260&simpl=msg-f:17767656364841872... 1/2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.