My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
701 75TH ST SE BLDG 3 SHORESIDE VILLAGE 2025-05-16
>
Address Records
>
75TH ST SE
>
701
>
SHORESIDE VILLAGE
>
701 75TH ST SE BLDG 3 SHORESIDE VILLAGE 2025-05-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2025 9:19:57 AM
Creation date
2/6/2025 3:02:53 PM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SE
Street Number
701
Unit
BLDG 3
Tenant Name
SHORESIDE VILLAGE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 10/28/2022 10/28/2022 BLDG 16-FINAL KURT KECK NOT READY eTRAKiT Inspection Request <br /> Notes: <br /> 10/24/2022 1:40 PM WRIGHT WAY CONSTRUCTION LLC <br /> final on unit 323 <br /> Contact Name:WRIGHT WAY CONSTRUCTION LLC <br /> Site Address:701 75TH ST BLDG 3 <br /> Phone:4258770250 <br /> e-Mail:wwcllc05O6@gmail.com <br /> Complete MEPs <br /> 11/1/2022 11/1/2022 BLDG 16-FINAL RAKEEB KHAN RESCHEDULE eTRAKiT Inspection Request <br /> ONLINE <br /> Notes: <br /> 10/28/2022 12:12 PM WRIGHT WAY CONSTRUCTION LLC <br /> unit 323 <br /> Contact Name:WRIGHT WAY CONSTRUCTION LLC <br /> Site Address:701 75TH ST BLDG 3 <br /> Phone:4258770250 <br /> e-Mail:wwcllc05O6@gmail.com <br /> Called wright way construction.No building inspector available.Reschedule online. <br /> 1/20/2023 1/20/2023 BLDG 16-FINAL KURT KECK CORRECTION eTRAKiT Inspection Request <br /> REQUIRED <br /> Notes: <br /> 1/19/2023 4:20 PM WRIGHT WAY CONSTRUCTION LLC <br /> Contact Name:WRIGHT WAY CONSTRUCTION LLC <br /> Site Address:701 75TH ST BLDG 3 <br /> Phone:4258770250 <br /> e-Mail:wwcllc05O6@gmail.com <br /> 1.Schedule electrical permit for final inspection <br /> 2.Reschedule for building final when ready <br /> 3/21/2023 F3/21/2023 BLDG 16 FINAL KURT KECK APPRVD-PERMIT eTRAKiT Inspection Request <br /> FINAL <br /> Notes: <br /> 3/15/2023 12:54 PM WRIGHT WAY CONSTRUCTION LLC <br /> Contact Name:WRIGHT WAY CONSTRUCTION LLC <br /> Site Address:701 75TH ST BLDG 3 <br /> Phone:4258770250 <br /> e-Mail:wwcllc05O6@gmail.com <br /> I <br /> Printed:Wednesday, 27 September, 2023 3 of 3 <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.