Laserfiche WebLink
PUBLIC WORKS PERMIT Date Applied: 11/1/2022 <br /> City of Everett Permit Services Public Works Permit#: PW2211-001 <br /> 3200 Cedar Street, 2" Floor Associated Bldg Permit#: B2211-002 <br /> EVERETT <br /> Everett, WA 98201 Planning Reference#: <br /> WASHINGTON everettwa.gov/permits Public Works Fee: $1,580.63 <br /> PermitServices@everettwa.gov Schedule Inspections at:online perm its.everettwa.gov <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> NOLAN DAVID E NOLAN DAVID E <br /> 502 92ND ST SE 502 92ND ST SE <br /> EVERETT,WA 98208-1901 EVERETT,WA 98208-1901 <br /> PHONE:4255821016 PHONE:4255821016 <br /> SITE ADDRESS: 1815 HOLBROOK AVE TAX PARCEL ID#:00549400501500 <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> DESCRIPTION:SITE WORK FOR NEW SFR <br /> NOTES: DRIVEWAY, HARDSCAPE& PAVEMENT <br /> PERMIT CONDITIONS: <br /> 1. All inspections shall be scheduled online at https://onlinepermits.everettwa.gov.Available inspection dates are shown in the dropdown <br /> menu. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and Specifications <br /> for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department.Approved plans must remain on job-site at all <br /> times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at onlinepermits.everettwa.gov to formally <br /> request all required inspections.A handout is provided at permit issuance with instructions on how to request an inspection online. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and per the direction of the PW Inspector and the approved <br /> SWPPP/TESC Plan. Remove upon completion of the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times. No dirt, mud,rocks,or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities during construction. <br /> 9. Any damage to City improvements(sidewalk,curb, roadway,etc.)shall be replaced per City Standards and/or as directed by the City PW <br /> Inspector. <br /> 10. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfaces will be managed on-site in <br /> a manner that does not adversely affect neighboring properties, including the City's right-of-way and/or easements and the improvements <br /> located therein. <br /> 11. Prior to any interruption to the public right-of-way(roadways,parking lanes,or sidewalks)a Traffic Street Use permit shall be obtained from <br /> the City's Traffic Engineering Division.This permit can be applied for online at onlinepermits.everettwa.gov and requires a traffic control plan to <br /> be submitted for the area of requested closure. Please allow 1-2 weeks for TSU permit issuance from the date of application. <br /> 12.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by selecting <br /> PW 25-Site Final/Permit Close Out within the Online Permitting Portal Inspection Requests for this permit when all items have been completed. <br /> 13. All work constructed within the public right-of-way must be removed or relocated at the owner's expense if the City ever requires use of the <br /> right-of-way for municipal purposes. <br /> Public Works Permit Fee Breakdown: <br /> Erosion Control................................................$50.00 <br /> Driveway/Asphalt Apron.................................$25.00 <br /> Grade/Fill/Excavate(250CY)...........................$90.00 <br /> Paving(1,780SF)..............................................$45.00 <br /> PW Plan Review...............................................$20.00 <br /> PW Site Inspection..........................................$20.00 <br /> Stormwater System Development Fee......$1,330.63 <br /> Page 1 of 2 <br /> -APPLICANT/JOB SITE COPY _ADDRESS FILE _TREASURER <br />