Laserfiche WebLink
PUBLIC WORKS PERMIT Date Applied: 9/21/2023 <br /> City of Everett Permit Services Public Works Permit#: PW2309-027 <br /> 3200 Cedar Street, 2nd Floor Associated Bldg Permit#: <br /> EV E R E T T Everett, WA 98201 Planning Reference#: <br /> everettwa.gov/permits Public Works Fee: $65.00 <br /> WASHINGTON Perm itSeryices@eyerettwa.goy Schedule Inspections at:onlinepermits.everettwa.gov <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> Nelson Petroleum Nelson Petroleum <br /> 1125 80th Street 1125 80th Street SW <br /> Everett,wa 98203 Everett,WA 98203 <br /> PHONE:4253539701 PHONE:4253539701 <br /> SITE ADDRESS:9826 7TH AVE SE TAX PARCEL ID#:28051800307300 <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> DESCRIPTION: INTERIM DISCHARGE PREVENTION PLAN CE23-0368-fuel island drainage routed to containment vault <br /> PERMIT CONDITIONS: <br /> 1. All inspections shall be scheduled online at https://onlinepermits.everettwa.gov.Available inspection dates are shown in the dropdown <br /> menu. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department.Approved plans must remain on job-site at <br /> all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at onlinepermits.everettwa.gov to formally <br /> request all required inspections. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and per the direction of the PW Inspector and the approved <br /> SWPPP/TESC Plan. Remove upon completion of the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times. No dirt,mud,rocks,or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities during construction. <br /> 9. Any damage to City improvements(sidewalk,curb,roadway,etc.)shall be replaced per City Standards and/or as directed by the City PW <br /> Inspector. <br /> 10. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfaces will be managed on-site <br /> in a manner that does not adversely affect neighboring properties,including the City's right-of-way and/or easements and the <br /> improvements located therein. <br /> 11. Prior to any interruption to the public right-of-way(roadways,parking lanes,or sidewalks)a Traffic Street Use permit shall be obtained <br /> from the City's Traffic Engineering Division.This permit can be applied for online at onlinepermits.everettwa.gov and requires a traffic <br /> control plan to be submitted for the area of requested closure. Please allow 1-2 weeks for TSU permit issuance from the date of application. <br /> 12. The Interim Discharge Prevention Plan(IDPP)shall provide a temporary solution to prevent polluted stormwater from leaving the site.The <br /> IDPP shall also provide a temporary solution to limit all surface water discharges from leaving the site,apart from those that follow the <br /> overflow and notification procedures identified in the plan.The final solution shall be provided according to the Corrective Action Notice <br /> Case Number:CE 23-0368. <br /> 13. The City shall be notified if there is a surface water overflow from the containment vault or associated conveyance.The City shall also be <br /> notified if there are any onsite oil spills. <br /> 14. The applicant shall update the IDPP to address the following: <br /> a. The IDPP letter indicates that the pump was sized based on 0.225 inches of rainfall in the 10-year,24-hour storm per the <br /> Snohomish County Drainage Manual isopluvial map.The map is in tenths of inches,so the rainfall for the referenced storm is 2.25 <br /> inches.This is consistent with City of Everett Design and Construction Standards and Specifications(DCSS)Table 4-3.1(D)which <br /> lists precipitation depths specific to Everett and interpreted from the isopluvial map. <br /> 15. The pumping vendor shall be retained as part of the contingency plan to provide back-up pumping in case of failure or if the vault pump <br /> capacity is exceeded (i.e.,due to a heavy,sustained storm). <br /> 16. All IDPP maintenance logs as well as vendor pump-out invoices shall be retained and made available to the City at request. <br /> 17. All oil/water separators will need to have elbows/tee's installed on the discharge end of the separators. <br /> Page 1 of 2 <br /> _APPLICANT/JOB SITE COPY _ADDRESS FILE _TREASURER <br />