My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9826 7TH AVE SE 2025-03-25
>
Address Records
>
7TH AVE SE
>
9826
>
9826 7TH AVE SE 2025-03-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 2:37:01 PM
Creation date
2/7/2025 9:08:38 AM
Metadata
Fields
Template:
Address Document
Street Name
7TH AVE SE
Street Number
9826
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix D <br /> Industrial Stormwater Monthly Inspection Report <br /> Inspections must be conducted by a person with the knowledge and skills to assess conditions and activities that could impact <br /> stormwater quality at the facility, and evaluate the effectiveness of best management practices required by this permit.Retain <br /> a copy of the completed and signed form in accordance with Permit Condition S9.C. <br /> FACILITY NAME: Nelson Petroleum, Inc. INSPECTION TIME: DATE: <br /> WEATHER INFORMATION: <br /> • Description of Weather Conditions (e.g., sunny, cloudy, raining, snowing, etc.): <br /> • Was stormwater(e.g., runoff from rain or snowmelt)flowing at outfalls and/or discharge areas shown on the Site Map <br /> during the inspection: ❑Yes ❑ No ❑ Comments: <br /> 1,POTENTIAL,POLLUTANT SOURCE AREA INSPECTION AND BEST MANAGEMENT PRACTICES EVALUATION <br /> SWPPP and Site Map: Have a copy of the SWPPP and site mapYe3 No Findings and Remedial Action Documentation: <br /> with you during the inspection so that you can ensure they are Describe any findings below and the schedule for <br /> current and accurate. Use it as an aide in recording the location of remedial action completion including the date <br /> any issues you identify during the inspection. initiated and date completed or expected to be <br /> • Is the Site Map current and accurate? completed. <br /> • Is the SWPPP inventory of activities, materials and products <br /> current? <br /> Any new potential pollutant sources must be added to the map and <br /> reflected in the SWPPP Facility Assessment& Tables 2, 2A, 3 an <br /> 5. <br />
The URL can be used to link to this page
Your browser does not support the video tag.