Laserfiche WebLink
Appendix D <br /> Industrial Stormwater Monthly Inspection Report <br /> Inspections must be conducted by a person with the knowledge and skills to assess conditions and activities that could impact <br /> stormwater quality at the facility, and evaluate the effectiveness of best management practices required by this permit.Retain <br /> a copy of the completed and signed form in accordance with Permit Condition S9.C. <br /> FACILITY NAME: Nelson Petroleum, Inc. INSPECTION TIME: DATE: <br /> WEATHER INFORMATION: <br /> • Description of Weather Conditions (e.g., sunny, cloudy, raining, snowing, etc.): <br /> • Was stormwater(e.g., runoff from rain or snowmelt)flowing at outfalls and/or discharge areas shown on the Site Map <br /> during the inspection: ❑Yes ❑ No ❑ Comments: <br /> 1,POTENTIAL,POLLUTANT SOURCE AREA INSPECTION AND BEST MANAGEMENT PRACTICES EVALUATION <br /> SWPPP and Site Map: Have a copy of the SWPPP and site mapYe3 No Findings and Remedial Action Documentation: <br /> with you during the inspection so that you can ensure they are Describe any findings below and the schedule for <br /> current and accurate. Use it as an aide in recording the location of remedial action completion including the date <br /> any issues you identify during the inspection. initiated and date completed or expected to be <br /> • Is the Site Map current and accurate? completed. <br /> • Is the SWPPP inventory of activities, materials and products <br /> current? <br /> Any new potential pollutant sources must be added to the map and <br /> reflected in the SWPPP Facility Assessment& Tables 2, 2A, 3 an <br /> 5. <br />