My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3006 RUCKER AVE 2025-03-24
>
Address Records
>
RUCKER AVE
>
3006
>
3006 RUCKER AVE 2025-03-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 10:09:50 AM
Creation date
2/7/2025 9:55:57 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
3006
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mechanical Requirements • • 25 of <br /> 2018 WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1 -- Administered by @2024 NEEA,All rights reserved <br /> The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the <br /> Washington State Energy Code,Commercial Provisions. <br /> For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com <br /> C408.1.2.2 Functional Identify in plans and specifications the <br /> performance testing intended operation of all equipment and <br /> criteria controls during all modes of operation, <br /> including interfacing between new and <br /> existing-to-remain systems <br /> C408.2.2 Air system and Indicate in plans that air and fluid flow rates <br /> hydronic system shall be tested and balanced within the <br /> balancing tolerances defined in the specifications; <br /> indicate systems shall be balanced in a manner <br /> to first minimize throttling losses,then <br /> adjusted to meet design flow conditions <br /> C408.2.2.1 Air system balancing Indicate devices that provide the capability to <br /> devices balance all supply air outlets,zone terminals <br /> and air handling equipment requiring system <br /> balancing <br /> C408.2.2.2 Hydronic system Indicate devices that provide the capability to <br /> balancing devices isolate,balance and measure flow across all <br /> hydronic equipment requiring system <br /> balancing including heating and cooling coils <br /> and pumps;or exception applied <br /> PROJECT CLOSE OUT DOCUMENTATION <br /> YES C103.6 Documentation and Indicate in plans that project close out Site Plan <br /> project close out documentation and training of building <br /> submittal operations personnel is required for all <br /> requirements mechanical components,equipment and <br /> systems governed by this code;indicate close <br /> out documentation shall include:record <br /> documents,O&M manuals,applicable WSEC <br /> mechanical equipment compliance reports and <br /> calculations <br /> Page 25125 <br />
The URL can be used to link to this page
Your browser does not support the video tag.