Laserfiche WebLink
' SOLARPRO SERIES SYSTEM COMPONENTS ' A BLUE RAVED <br /> ' INSTALLATIUN GUIDE ; PAGE 1403 N.Research Way <br /> ■ ■ ' Orem,UT 84097 <br /> SM MOUNT800.377.4480 <br /> --------------------------------------------------------------------------------------------------------------------------------------------- WWW.BLUERAVENSOLAR.COM <br /> CONFIDENTIAL-THE INFORMATION <br /> See Appendix Cfor GRAIL: Supports PV modules. Use at least two per HEREIN CONTAINED SHALL NOT BE <br /> Universal AF Installation USED FOR THE BENEFIT OF ANYONE <br /> row of modules.Aluminum extrusion available in EXCEPT BLUE RAVEN SOLAR NOR <br /> 0 SHALL IT BE DISCLOSED IN WHOLE OR <br /> ® ♦ mill, clear anodized, or dark anodized. IN PART TO OTHERS OUTSIDE <br /> ♦ O RECIPIENTS ORGANIZATION,EXCEPT <br /> ©©RAIL SPLICE: Non structural splice joins, IN CONNECTION WITH THE SALE AND <br /> USE OF THE RESPECTIVE EQUIPMENT, <br /> O aligns' and electrically bonds rail sections into WITHOUT THE WRITTEN PERMISSION <br /> ® OF BLUE RAVEN SOLAR LLC. <br /> ® single length of rail. Forms a rigid splice joint, 4 <br /> 0 inches long, preassembled with bonding hardware. NABCEP <br /> *See Appendix Cfor ♦ Available in dark anodized or mill finish. <br /> Universal AFInstallation � ♦ CERTIFIED <br /> ♦�© OL-FOOT: Use to secure rails through roofing PV INSTALLATION <br /> material to building structure. Refer to loading PROFESSIONAL <br /> ® �O tables or U-Builder for spacing. Scott Gurney <br /> #PV-011719-015866 <br /> © L-FOOT T BOLT: (3/8" x 3�4" or 1") - Use one per CONTRACTOR: <br /> L-foot to secure rail to L-foot. Stainless steel. BRS FIELD OPS <br /> Supplied with L-foot in combination with flange 385-498-6700 <br /> nut, <br /> provides electrical bond between L-foot and rail. <br /> @SERRATED FLANGE NUT : Use one per L-foot <br /> to secure and bond rail to Lfoot. Stainless steel. <br /> Supplied with L-foot. <br /> OMODULE ENDCLAMP: Pre-assembled universal <br /> j+ ° clamp that secures module to rail at module <br /> SM STANDARD RAIL � flange by tightening 1/2" hex head bolt. <br /> © @MODULE MIDCLAMP: Pre-assembled clamp <br /> 4 — SM LIGHT RAIL provides module to module and module to rail <br /> bond.Aluminum clamp with stainless steel <br /> 1 <br /> bonding pins and T-bolt.Available in clear or <br /> dark finish. <br /> OMICROINVERTER MOUNTING BOLT: <br /> Wrenches and Torque Anti-Seize @O Preassembled bolt, nut, and captive star washer DRAWING BY: <br /> Wrench or Socket Size Recommended Stainless steel hardware can seize up,a process called attaches and bonds microinverter to rail. <br /> Torque(ft-lbs) galling.To significantly reduce its likelihood: PLOT DATE: <br /> Mid Clamp 0 1/2" 11 1.Apply minimal lubricant to bolts only where VOTE - POSITION INDICATOR:T bolts nave a slot <br /> MLPE Mount 0 1/2" 10 I of the T Head <br /> indicated in installation process,preferably Anti-Seize in the hardware end corresponding to the direction <br /> commonly found at auto parts stores (Anti-seize has PROJECT NUMBER: <br /> . <br /> End Clamp 0 1/2" 5 been factory applied to mid clamp bolts) <br /> L-Foot to Rail 0 1/2" 30 2.Shade hardware prior to installation,and SHEET NAME: <br /> 3.Avoid spinning stainless nuts onto bolts at high speed. NOTE - Pro Series Mid and End Clamps are single <br /> Rail Splice © 1/2" 10 use only SPEC SHEET <br /> REVISION: PAGE NUMBER: <br /> SS <br />