Laserfiche WebLink
INSPECTION REPORT - <br /> Date: 3('/U ((p Permit: (i fi�Dt9-(v�/ <br /> Contractor: Citit fleedi is j <br /> Owner: �e� �J <br /> SiteCe: (54 S W <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑ Groundwork/Slab El Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation El Ceiling Grid ❑Ceiling Grid <br /> El Rough In El Structural Slab El OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> El Grounding ❑Insulation ❑ Mechanical Final El Medical Gas <br /> • eiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> is lectrical Final ❑Shear Nailing GAS PIPE <br /> .ITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> III Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> El Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> �p El <br /> C.O. ❑ VIOLATION <br /> 2 .NA LE TO PERFORM INSPECTION: <br /> I - AL (425)257-8881 FOR REINSPECTION-24 hour notice required <br /> /Up Ace_5 S <br /> Inspector: ,z7 <br /> 4Date: 3/7/ 1 G <br /> EIR(4/09) ayarsa FORMS&PROMOTIONS•425/4188-a900 <br />