Laserfiche WebLink
<br /> <br /> <br />6.3 Violation of operations and maintenance requirements <br />The first failure to meet operations and maintenance requirements will result in a warning and <br />required improvement plan explaining how improvement will be made in future reporting <br />periods. Repeat violations will result in COMMERCE’s right to recoup up to ten percent of <br />disbursed project costs. <br /> <br />Docusign Envelope ID: 9CA32415-9130-4D24-B542-1ED1AA5501F1