Laserfiche WebLink
City of Everett <br /> Property Access Work Plan <br /> Property Access - Work Plan (WP) <br /> A completed work plan is required for all invasive Right of Entries. The intent of this WP is to identify safe <br /> and legal access for field activities. To participate in field activities, contracted parties must follow the <br /> WP, Safety Plan, approved right of entry, and coordinate with Sound Transit Community Outreach. <br /> Project Name Everett Link Extension&OMF Property Type City of Everett ROW and <br /> North Owned Parcels <br /> Property Owner City of Everett ST ROW ID <br /> County Tax ID Field Work Point of Rajan Ramya <br /> Number Contact (630-536-4183) <br /> Prepared by Shannon and Wilson Submission Date 4/5/2024 <br /> Activity Work Duration Schedule <br /> Addition to work currently being carried out <br /> under permit numbers PW2401-004, <br /> Geotechnical Boring (including pavement 2-5 days of work per PW2401-005, PW2401-006, PW2401-007, <br /> coring, potholing, and traffic control setup) soil boring location and PW2401-008. <br /> Work anticipated to commence immediately <br /> after receipt of necessary permit approval. <br /> PROJECT DESCRIPTION INCLUDING NEED FOR ACCESS <br /> This Property Access Plan(PAP)outlines the planned Geotechnical Investigation and Exploration work to <br /> support the Phase 2 Sound Transit Everett Link Extension&OMF North project(EVLE).The proposed <br /> fieldwork will support light rail transit alignment assessment from 44th Avenue West and 200th Street Southwest in <br /> Everett to Hewitt Avenue and Broadway in Everett. <br /> WORK AREA <br /> A work zone approximately 15 feet wide by 60 feet long and approximately centered about each boring location <br /> will be required for drilling.A truck-or track-mounted drill-rig,a crew pickup truck,and passenger vehicle for <br /> technical staff will also be on site during drilling. Refer to Appendix A for proposed boring locations, and Appendix <br /> B for proposed work areas. The proposed work areas shown are approximate and may be enlarged in size, <br /> reduced in size,or moved depending on site-specific conditions,such as surface or subsurface obstructions, <br /> underground or aboveground known or suspect utilities or other observations during the site reconnaissance. <br /> Hand-marked revisions will be made to Appendix A to show adjustments to proposed Geotechnical Investigation <br /> and Exploration locations. <br />