My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2509 57TH ST SW 2025-03-26
>
Address Records
>
57TH ST SW
>
2509
>
2509 57TH ST SW 2025-03-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2025 7:53:35 AM
Creation date
2/10/2025 8:57:34 AM
Metadata
Fields
Template:
Address Document
Street Name
57TH ST SW
Street Number
2509
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Client: Ella Anumodu 03/20/2024 <br /> Address: 2509 57th St SW <br /> Everett, WA 98203 <br /> Contact#:404-259-2040 <br /> Email: eicanum@gmail.com <br /> Scope of work <br /> • Remove all wood chips that are in the backyard. <br /> • Remove and install drainpipes for stormwater. <br /> • Build a dog pen in the lower right backyard area. <br /> • Level ground. <br /> • Install 26'x 25' concrete for a basketball court. <br /> • Install 660 sq ft of artificial grass (Turf) from the backyard entrance and around the <br /> parameters of the court. <br /> • Upon approval, estimated time of work completion 4/30/24 <br /> Description of Work <br /> • Concrete will be 25' x 26' (650 sf) on the top right back side of the property located at <br /> 2509 57th St SW, Everett, WA 98203.To build the structure of the basketball court, rebar and <br /> (2x4s)will be used. <br /> • The basketball court(concrete)will have a 3" slope (1/8 of 12")from the fence <br /> neighboring#2505 to the existing concrete.This slope will enable the stormwater to flow <br /> down towards the existing drainpipes into the stream located behind the property. <br /> • The distance between the fence and the concrete is 8".The thickness of the concrete <br /> will be 3 %". Concrete will be surrounded by 660sq ft of turf as shown in the drawing. <br /> Between new concrete and existing concrete there will be a 4" sewer and drain perforated <br /> pipe, where stormwater will go.The pipe will be placed above sand and will be surrounded <br /> by drain rocks which will be covered by landscape fabric. Lastly,turf will be placed on top. <br /> • Before placing the turf, landscaping fabric will be placed so that weeds won't grow. To <br /> spread evenly infill in the turf, a power broom will be used.Turf will be around the concrete <br /> (basketball court) and by the entrance to the backyard. <br /> • Yard guard netting will be installed along the fence shared with the#2505 neighbor and <br /> to the left of the court to prevent roll away basketballs.The netting will be 15 ft high and 35 <br /> linear feet. <br /> Materials Used <br /> • Gravel <br /> • Sand <br /> • Landscape fabric <br />
The URL can be used to link to this page
Your browser does not support the video tag.