Laserfiche WebLink
STRATTON HILL HOMEOWNERS ASSOCIATION, DIV. II <br /> Major Landscaping Change Approval Form <br /> Use this form if you intend a major landscaping change on your property. Examples of <br /> "major change" include but are not limited to: <br /> • Re-Grading of property either with addition/removal of a retaining wall or <br /> addition/removal of a slope <br /> • Removal or replacement of greater than 50%of existing trees/shrubs <br /> • Complete lawn replacement of front or side yard visible from the street. For <br /> artificial/synthetic lawn installation, please refer to the "Installation of Artificial <br /> Turf Approval Form" <br /> • New planting beds within the minimum setback as shown in the drawings <br /> provided on this form <br /> • New vegetable gardens shall be located at the rear/back of the house and shall <br /> not be visible to adjoining streets. I <br /> Name: 01 V(i( <br /> -D A-11OV110d�A_ <br /> E-Mail: C'1 C ( I�j <br /> Address/ Lot# �` �� / 51 6� V6 29 <br /> Phone Number(s): J0 4 0�W zoC/7 Cell <br /> Date Submitted: <br /> Attach additional pages to fully describe and diagram the proposed changes in detail. <br /> Once approved by the Stratton Hill ACC committee,all proposed changes must be <br /> completed within 6 months. Z Z 12�Z <br /> Project Start Date: ' ZV2 4 Project Completion Date: <br /> ACC approval of project is limited to 6 months after the approval date. <br /> Attach brochures and specifications, material samples, etc. These will not be returned, <br /> but will stay with the ACC. You may also send your form and attachments to: <br /> architecture strattonhill.org &to Kyle@communitVassociation.net <br /> Or by mail to: <br /> Kyle Kurisu <br /> Community Association Management, Ilc <br /> P 0 Box 625 <br /> Arlington, WA 98223 <br /> ..................•---•--..........................................................._ <br /> Please contact the HOA Manager, Kyle Kurisu ACC USE ONLY <br /> at (425) 268-9302 or email Kyle@communityassociation.net i Date Rec'd <br /> to coordinate the submission of samples, if necessary. Date Approved/Denied: <br /> Reply Letter Sent: <br /> Major Landscaping Change Approval Form 01-2020 Final Inspection. € <br /> •:•..•...................................... <br />