My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
625 93RD ST SW 2025-05-22
>
Address Records
>
93RD ST SW
>
625
>
625 93RD ST SW 2025-05-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2025 4:05:07 PM
Creation date
2/10/2025 9:28:58 AM
Metadata
Fields
Template:
Address Document
Street Name
93RD ST SW
Street Number
625
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBL•WORKS PERMIT Date Applied: 6/8/2023 <br /> CityIt <br /> of Everett Permit Services blic Works Permit#: PW2306-006 <br /> 3200 Cedar Street, 2" Floor Associated Bldg Permit#: B2304-066 <br /> EVERETT Everett, WA 98201 Planning Reference#: <br /> everettwa.gov/permits Public Works Fee: $253.19 <br /> WASHINGTON PermitServices@everettwa.Rov Schedule Inspections at:onlinepermits.everettwa.gov <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> RALSTON MARGARET SCOTT J JOHNSON <br /> 625 93RD ST SW <br /> EVERETT,WA 98204 <br /> PHONE: PHONE:2066961078 <br /> SITE ADDRESS:625 93RD ST SW TAX PARCEL ID#:00533900000800 <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> DESCRIPTION:SITE WORK FOR CARPORT AND SFR ADDITION <br /> PERMIT CONDITIONS: <br /> 1. All inspections shall be scheduled online at https://onlinepermits.everettwa.gov.Available inspection dates are shown in the dropdown <br /> menu. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department.Approved plans must remain on job-site at <br /> all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at onlinepermits.everettwa.gov to formally <br /> request all required inspections. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and per the direction of the PW Inspector and the approved <br /> SWPPP/TESC Plan. Remove upon completion of the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times. No dirt,mud,rocks,or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities during construction. <br /> 9. Any damage to City improvements(sidewalk,curb,roadway,etc.)shall be replaced per City Standards and/or as directed by the City PW <br /> Inspector. <br /> 10. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfaces will be managed on-site <br /> in a manner that does not adversely affect neighboring properties,including the City's right-of-way and/or easements and the <br /> improvements located therein. <br /> 11. Prior to any interruption to the public right-of-way(roadways,parking lanes,or sidewalks)a Traffic Street Use permit shall be obtained <br /> from the City's Traffic Engineering Division.This permit can be applied for online at onlinepermits.everettwa.gov and requires a traffic <br /> control plan to be submitted for the area of requested closure. Please allow 1-2 weeks for TSU permit issuance from the date of application. <br /> 12. This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by selecting <br /> PW 25-Site Final/Permit Close Out within the Online Permitting Portal Inspection Requests for this permit when all items have been <br /> completed. <br /> PERMIT FEE BREAKDOWN: <br /> Erosion Control $50.00 n (� (� <br /> Driveway Apron(No C/G) $25.00 s e U (� <br /> -7;\ <br /> Paving(348 SF) $45.00 L=� <br /> PW Plan Review $20.00 <br /> PW Site Inspection $20.00 AUG V 8 2023 <br /> Stormwater System Development Fee(348 SF) $93.19 <br /> CITY OF EVERETT <br /> Permit Services <br /> Page 1 of 2 <br /> _APPLICANT/JOB SITE COPY /X ADDRESS FILE _TREASURER <br />
The URL can be used to link to this page
Your browser does not support the video tag.