Laserfiche WebLink
2022 Stormwater System Development Fee Calculations <br /> Permit#: PW2306-006 Additional Notes: <br /> Project Address: 625 93rd ST SW Stormwater system development fees split on two separate permits:ground hard surfaces <br /> Project Name: SITE WORK FOR CARPORT AND SFR ADDITION calculated on Public Works Permit and roof hard surfaces calculated on Building Permit. <br /> Answer the Following Questions(Required):All Yellow Inputs <br /> Water District: Everett <br /> Sewer District: •Everett Prepared By: THAD NEWPORT Date: 6/9/2023 <br /> Outside City Limits? No *Adds a 25%Surcharge <br /> Supportive Housing Credit? No *Reduces by 80% Reviewed By: Date: <br /> Fee Calculations: <br /> Stormwater System Development Fees: <br /> Permit#: B2304-066 Type of Construction: Existing Development Adding New+Replaced Hard Surfaces <br /> Square Feet of New Plus Replaced Hard Surfaces: 700 SF • <br /> Stormwater System Dev Fee: $187.46 Add this fee to the Building Permit for roof area hard surfaces. <br /> Stormwater System Development Fees: <br /> Permit#: PW2306-006 Type of Construction: Existing Development Adding New+Replaced Hard Surfaces <br /> Square Feet of New Plus Replaced Hard Surfaces: 348 SF <br /> Stormwater System Dev Fee: $93.19 Add this fee to the Public Works Permit for hard surfaces on the ground. <br /> • <br />