My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8625 3RD AVE SE 2025-03-24
>
Address Records
>
3RD AVE SE
>
8625
>
8625 3RD AVE SE 2025-03-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:11:10 PM
Creation date
2/10/2025 9:48:15 AM
Metadata
Fields
Template:
Address Document
Street Name
3RD AVE SE
Street Number
8625
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 1: Describe the project during construction <br /> Nature and purpose of the construction project: <br /> Replace existing valves on Alderwood Water & Wastewater District's 30" and 36" <br /> potable water Transmission Mains 1 and 2, with new butterfly valves, manway tees, <br /> air vac piping (when impacted), and connection to existing 30" and 36" water main <br /> piping. <br /> Adjacent areas,including streams,lakes,wetlands,residential areas,and roadsthat <br /> might be affected by the construction project: <br /> No sensitive areas will be impacted by this construction. Existing valves are located <br /> in paved roadways, shoulders, and sidewalks as shown on the plans. <br /> How upstream drainage areas may affect the site: <br /> Upstream drainage areas are not anticipated to affect either of the two project sites. <br /> Downstream drainage leading from the site to a receiving body of water: <br /> BMPs will be installed to prevent erosion and sediment from leaving the two project <br /> sites during construction of the valve replacements. <br /> Critical areas that receive runoff from the site up to one-quarter mile away: <br /> There are no critical areas within one-quarter mile of the sites that would receive runoff from the <br /> project sites. There are two wetlands within a quarter mile of Site 1-2 (Wood Creek Basin) and Site <br /> 1-3 (Lake Washington Watershed), however based on the City's GIS, site runoff is not routed to <br /> these wetlands. Attached City of Everett Critical Map identifies the site locations, along with a <br /> one-quarter mile radius around each site. <br /> Special requirements and provisions for working near or within critical areas: <br /> No work will occur near or within critical areas. <br /> Areas on the site that have potential erosion problems: <br /> There are no areas on the projects sites that have potential for erosion problems <br /> cause by construction of the valve replacement. All areas are flat and located in <br /> paved right-of-way. <br /> Locations where surface water leaves the site: <br /> No disturbed areas are expected to contribute to surface water runoff. <br /> City of Everett Public Works <br /> Construction Stormwater Pollution Prevention Plan 2 of 6 <br /> (SWPPP) Template for Small Projects <br />
The URL can be used to link to this page
Your browser does not support the video tag.