My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6708 CADY RD 2025-03-31
>
Address Records
>
CADY RD
>
6708
>
6708 CADY RD 2025-03-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 7:46:21 AM
Creation date
2/10/2025 10:18:47 AM
Metadata
Fields
Template:
Address Document
Street Name
CADY RD
Street Number
6708
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Element 6: Protect Slopes (2.1.6) <br /> Will steep slopes be present at the site during construction? <br /> No <br /> All cut and fill slopes will be designed, constructed, and protected in a manner that <br /> minimizes erosion. The following specific BMPs will be used to protect slopes for this <br /> project: <br /> • Mulching (BMP C121) <br /> • Plastic Covering (BMP C123) <br /> • Temporary and Permanent Seeding (BMP C120) <br /> Erosion will be minimized by designing and constructing cut-and-fill slopes in a manner where <br /> continuous length of slope will be reduced with diversions and roughening slope surfaces. <br /> Stormwater runoff will be diverted away from slopes and disturbed areas with interceptor dikes, <br /> pipes, and swales. Check dams will be installed every 100' or 2' of elevation change along <br /> constructed channels in order to recude flow velocity and erosion. Excavated material shall be <br /> placed on the uphill side of trenches, consistent with safety and space considerations. <br /> Responsible Staff: Contractor <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.