My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6708 CADY RD 2025-03-31
>
Address Records
>
CADY RD
>
6708
>
6708 CADY RD 2025-03-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 7:46:21 AM
Creation date
2/10/2025 10:18:47 AM
Metadata
Fields
Template:
Address Document
Street Name
CADY RD
Street Number
6708
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reporting and Record Keeping (6.0) <br /> Record Keeping (6.1) <br /> Site Log Book (6.1.1) <br /> A site log book will be maintained for all on-site construction activities and will include: <br /> • A record of the implementation of the SWPPP and other permit requirements <br /> • Site inspections <br /> • Sample logs <br /> Records Retention (6.1.2) <br /> Records will be retained during the life of the project and for a minimum of three (3) years <br /> following the termination of permit coverage in accordance with Special Condition S5.0 of the <br /> CSWGP. <br /> Permit documentation to be retained on-site: <br /> • CSWGP <br /> • Permit Coverage Letter <br /> • SWPPP <br /> • Site Log Book <br /> Permit documentation will be provided within 14 days of receipt of a written request from <br /> Ecology. A copy of the SWPPP or access to the SWPPP will be provided to the public when <br /> requested in writing in accordance with Special Condition S5.G.2.b of the CSWGP. <br /> Updating the SWPPP (6.1.3) <br /> The SWPPP will be modified if: <br /> • Found ineffective in eliminating or significantly minimizing pollutants in stormwater <br /> discharges from the site. <br /> • There is a change in design, construction, operation, or maintenance at the construction <br /> site that has, or could have, a significant effect on the discharge of pollutants to waters <br /> of the State. <br /> The SWPPP will be modified within seven (7) days if inspection(s) or investigation(s) determine <br /> additional or modified BMPs are necessary for compliance. An updated timeline for BMP <br /> implementation will be prepared. <br /> Reporting (6.2) <br /> Discharge Monitoring Reports (6.2.1) <br /> Cumulative soil disturbance is one (1) acre or larger; therefore, Discharge Monitoring <br /> Reports (DMRs) will be submitted to Ecology monthly. If there was no discharge during a given <br /> monitoring period the DMR will be submitted as required, reporting "No Discharge". The DMR <br /> due date is fifteen (15) days following the end of each calendar month. <br /> DMRs will be reported online through Ecology's WQWebDMR System. <br /> 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.