Laserfiche WebLink
Project: POE Central Marina Fuel Dock By: NAP <br /> IqJff Location: Everett,WA Date: 3 8 2023 <br /> Checked By: <br /> Element Design Summary Date: <br /> The following provides a summary of all designed elements. <br /> Element Demand Capacity D/C Design Reference <br /> Single stud vertical capacity 1753 Ibs 9399 Ibs 19% Enercalc <br /> Wall stud capacity - - 29% Enercalc <br /> Timber post vertical capacity 1342 Ibs 4301 Ibs 31% Enercalc <br /> Timber post base 1342 Ibs 5775 Ibs 23% Simpson catalog <br /> Attendant bldg overhang beam 625 psi 1375 psi 45% Enercalc <br /> Vending shelter long beam - psi - psi 95% Enercalc <br /> Beam hanger 1221 Ibs 1440 psi 85% Simpson catalog <br /> Shear wall panel 565 plf 603 plf 94% AWS SDPWS <br /> Shear wall anchorage-sill plate 1883 Ibs 2130 Ibs 88% Hilti catalog <br /> Shear wall anchorage-curb 1256 Ibs 3862 Ibs 33% Hilti catalog <br /> Shear wall anchorage-hold down 5964 Ibs 6241 Ibs 96% Hilti Profis <br /> Shear wall hold down 3548 Ibs 5820 Ibs 61% Sim son catalog <br /> Truss uplift tie 253 Ibs 615 Ibs 41% Simpson catalog <br /> Diaphragm 158 plf 253 plf 62% AWS SDPWS <br /> 1/1 <br />