Laserfiche WebLink
Project Title: POE Central Marina Fuel Dock <br /> Engineer: NAP <br /> Project ID: 2100176 <br /> Project Descr: <br /> Wood Column Project File: POE Building Design Calcs.ec6 <br /> LIC#:KW-06014851,Build:20.23.2.14 KPFF CONSULTING ENGINEERS (c)ENERCALC INC 1983-2022 <br /> DESCRIPTION: Timber Post Vertical Capacity <br /> Maximum Reactions Note:Only non-zero reactions are listed. <br /> X-X Axis Reaction k Y-Y Axis Reaction Axial Reaction My-End Moments k-ft Mx-End Moments <br /> Load Combination @ Base @ Top @ Base @ Top @ Base @ Base @ Top @ Base @ Top <br /> +0.60D 0.511 <br /> Lr Only 0.490 <br />