My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
610 14TH ST 2025-04-01
>
Address Records
>
14TH ST
>
610
>
610 14TH ST 2025-04-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 7:13:18 AM
Creation date
2/10/2025 10:54:18 AM
Metadata
Fields
Template:
Address Document
Street Name
14TH ST
Street Number
610
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATEMENT OF SPECIAL INSPECTION AND TESTING NOTES: <br /> 1. SPECIAL INSPECTIONS SHALL CONFORM TO CHAPTER 17 OF THE INTERNATIONAL BUILDING CODE REQUIRED SPECIAL INSPECTIONS - FABRICATION REQUIRED SPECIAL INSPECTIONS - CONCRETE <br /> (IBC) AND THE REFERENCE CODES AND STANDARDS LISTED IN NOTE 2. <br /> INSPECTION INSPECTION <br /> 2. REFERENCE CODES AND STANDARDS ARE AS FOLLOWS: IBC CODE FREQUENCY IBC CODE FREQUEN <br /> IBC 2018 SYSTEM OR MATERIAL REF. REMARKS SYSTEM OR MATERIAL REF. CY REMARKS <br /> ACI 318-14 CODE OR STD. REF. CODE OR STD. REF. <br /> AWC SDPWS 2015 CONT PER. CON PER. <br /> ASTM CURRENT EDITION T <br /> RCSC 2009 WHERE FABRICATION OF INSPECT REINFORCEMENT, TB ACI 318: 20, TOLERANCE AND <br /> STRUCTURAL, LOAD-BEARING INCLUDING EMBEDMENTS AND 1705.3(1) 25.2-25.3, X REINFORCING PLACEMENT <br /> 3. SPECIAL INSPECTIONS AND ASSOCIATED TESTING SHALL BE PERFORMED BY AN APPROVED OR LATERAL LOAD-RESISTING PRESTRESSING TENDONS, AND 1705.3 26.6.1-26.6.3, <br /> QUALIFIED TESTING AND INSPECTING AGENCY MEETING THE REQUIREMENTS OF ASTM E 329 MEMBERS OR ASSEMBLIES IS VERIFY PLACEMENT. 1908.4 26.8, 26.13.3 PER ACI 318: 26.6 <br /> (MATERIALS), ASTM D 3740 (SOILS), ASTM C 1077 (CONCRETE), AND ASTM E BEING PERFORMED ON THE INSPECT ANCHORS CAST IN WAC51-5 ALL ANCHORS SHALL BE <br /> 543(NON-DESTRUCTIVE). THE TESTING AND INSPECTING AGENCY SHALL FURNISH TO THE ENGINEER PREMISES OF A FABRICATOR'S CONCRETE 0-1705 ACI 318 17.8.2 - X VISUALLY INSPECTED <br /> A COPY OF THEIR SCOPE OF ACCREDITATION. SPECIAL INSPECTORS SHALL BE CERTIFIED BY THE SHOP, SPECIAL INSPECTION OF <br /> BUILDING OFFICIAL. INSPECTION IN FABRICATION 170425 - - - THE FABRICATED ITEMS SHALL INSPECT ANCHORS POST-INSTALLED IN HARDENED CONCRETE MEMBERS <br /> . . <br /> SHOP BE AS REQUIRED BY TABLE 2 ADHESIVE ANCHORS AND <br /> 4. THE SPECIAL INSPECTOR SHALL OBSERVE THE INDICATED WORK FOR COMPLIANCE WITH THE ADHESIVE REINFORCING DOWELS <br /> APPROVED CONSTRUCTION DOCUMENTS. ALL DISCREPANCIES SHALL BE BROUGHT TO THE AND AS REQUIRED ELSEWHERE TB ACI 355.41CC/IAPMO REFER TO ANCHOR CALLOUTS FOR <br /> ATTENTION OF THE CONTRACTOR FOR CORRECTION AND NOTED IN THE INSPECTION REPORTS. IN THE STATEMENT OF INSTALLED IN HORIZONTALLY 1705.3(4. EVALUATION REPORT ACI X - SUSTAINED TENSION (ST) <br /> ISSUES REQUIRING IMMEDIATE CORRECTIVE ACTIONS OR ENGINEERING INPUT ARE TO BE BROUGHT SPECIAL INSPECTIONS. OR UPWARDLY INCLINED a) 318: 17.8.2.4,... DESIGNATION <br /> TO THE ENGINEER'S ATTENTION IMMEDIATELY UPON DISCOVERY. REFERENCE SECTION 1704.2.5.1 ORIENTATIONS TO RESIST <br /> FOR APPROVED FABRICATOR SUSTAINED TENSION LOADS. <br /> 5. THE SPECIAL INSPECTOR SHALL FURNISH INSPECTION REPORTS FOR EACH INSPECTION TO THE EXCEPTION. MECHANICAL ANCHORS, TB ACI 355.41CC/IAPMO <br /> BUILDING OFFICIAL, ENGINEER,CONTRACTOR, AND OWNER. THE TESTING AND INSPECTING AGENCY ADHESIVE ANCHORS, AND ALL ANCHORS SHALL BE VISUALLY <br /> SHALL SUBMIT A FINAL REPORT STATING THAT THE WORK REQUIRING SPECIAL INSPECTION WAS ADHESIVE REINFORCING DOWELS 1705.3(4. EVALUATION REPORT ACI - X INSPECTED <br /> INSPECTED AND IS IN CONFORMANCE WITH THE APPROVED CONSTRUCTION DOCUMENTS AND THAT REQUIRED SPECIAL INSPECTIONS - WOOD NOT DEFINED ABOVE. b) 318: 17.8.2,... <br /> ALL DISCREPANCIES NOTED IN THE INSPECTION REPORTS HAVE BEEN CORRECTED. TB <br /> 6. CONTINUOUS (CONT.) SPECIAL INSPECTION: SPECIAL INSPECTION BY THE SPECIAL INSPECTOR WHO INSPECTION 1705.3(5) ACI 318: 9, <br /> IS PRESENT WHEN AND WHERE THE WORK TO BE INSPECTED IS BEING PERFORMED. PERIODIC (PER.) VERIFY USE OF REQUIRED 1705.3 26.4.3-26.4.4, - X - <br /> SPECIAL INSPECTION: SPECIAL INSPECTION BY THE SPECIAL INSPECTOR WHO IS INTERMITTENTLY IBC CODE FREQUEN DESIGN MIX. 1904 26.13.3 <br /> PRESENT WHERE THE WORK TO BE INSPECTED HAS BEEN OR IS BEING PERFORMED. SYSTEM OR MATERIAL REF. CY REMARKS 19082 <br /> 3 CODE OR STD. REF. CON PER. 1908.3 <br /> 7. WHERE PERIODIC INSPECTION IS ALLOWED IN ACCORDANCE WITH THE ANCHOR ICC/IAPMO T VERIFY CURING METHOD AND ACI 318:26.5.3-26.5.5, _ <br /> EVALUATION REPORT, INSPECTIONS SHALL BE AS FOLLOWS: FABRICATION OF REFER TO INSPECTION IN DURATION OF CURING FOR - X <br /> 26.13.3 <br /> PREFABRICATED STRUCTURAL 1704.2.5 - - X FABRICATION SHOP EACH MEMBER. <br /> - FOR ALL ANCHORS, PRIOR TO CONCEALMENT, VERIFY: ANCHOR TYPE, ANCHOR ELEMENTS REQUIREMENTS VERIFY MAINTENANCE OF TB <br /> DIMENSIONS, ANCHOR SPACING AND EDGE DISTANCE. SPECIFIED CURING 1705.3(8) ACI 318:26.5.3-26.5.5, <br /> VERIFY STRUCTURAL PANEL TEMPERATURE AND 1705.3 26.13.3 X <br /> - FOR EACH ANCHOR TYPE AND SIZE, INSPECTOR SHALL BE ONSITE TO CONTINUOUSLY GRADE AND THICKNESS. VERIFY TECHNIQUES. 1908.9 <br /> AWCSDP <br /> INSPECT A MINIMUM OF THE FIRST 10ANCHORS INSTALLED BY EACH INSTALLER FOR NOMINAL SIZE OF FRAMING <br /> $ CONFORMANCE WITH ICC/IAPMO EVALUATION REPORT. PROVIDED ALL ANCHORS ARE MEMBERS AT ADJOINING PANEL <br /> `o INSTALLED CORRECTLY PER MANUFACTURER'S INSTRUCTIONS, PROVIDE PERIODIC WSTB <br /> FABRICATION OF HIGH-LOAD EDGES. VERIFY NAIL OR STAPLE <br /> INSPECTION ON A MINIMUM OF 10% OF THE NEXT 1000 ANCHORS BY EACH INSTALLER AND DIAPHRAGMS 4.21705. - - X DIAMETER AND LENGTH, NUMBER <br /> N A MINIMUM OF 5% OF THE REMAINING ANCHORS BY EACH INSTALLER. INSPECTIONS SHALL 5.12306. OF FASTENER LINES AND <br /> OCCUR A MINIMUM OF ONCE PER WEEK AT A RANDOM TIME WHILE ANCHOR INSTALLATION 2 SPACING BETWEEN FASTENERS IN <br /> m IS ONGOING. ANY NON-COMPLIANCE ISSUES SHALL RESET THE INSPECTION REQUIREMENTS EACH LINE AND AT EDGE <br /> �I TO TEN (10) CONTINUOUS INSPECTIONS. NON-COMPLIANT ANCHORS SHALL BE BROUGHT MARGINS <br /> TO THE ATTENTION OF THE ENGINEER OF RECORD FOR REVIEW AND SHALL BE <br /> o BROUGHT INTO COMPLIANCE BY EITHER TESTING OR RE-INSTALLATION. <br /> 73 SPECIAL INSPECTIONS APPLY TO <br /> - INSPECTION REPORTS SHALL IDENTIFY NAMES OF INSTALLERS. 1703.4 ICC/IAPMO HOLD-DOWN ANCHOR SIZE AND <br /> PREFABRICATED WOOD SHEAR 1705.1.1 EVALUATION - X PLACEMENT,INCLUDING <br /> SPECIAL INSPECTOR SHALL PROVIDE DOCUMENTATION AT THE END OF ANCHOR PANELS (3) REPORT EMBEDMENT LENGTH, <br /> INSTALLATIONS STATING THAT THE MINIMUM NUMBER OF ANCHORS WERE INSPECTED. SPACING,AND EDGE DISTANCE <br /> 8. OBSERVPENDING (OES.): OBSERVE THESE ITEMS ER A RANDOM BASIS. OPERATIONS NEED NOT BE DELAYED REQUIRED STRUCTURAL SPECIAL INSPECTIONS - WIND <br /> <, PENDING THESE INSPECTIONS.PERFORM (PERF.): PERFORM THESE TASKS FOR EACH ELEMENT. <br /> w <br /> o <br /> RESISTANCE <br /> o INSPECTION <br /> IBC CODE FREQUEN <br /> SYSTEM OR MATERIAL REF. CY REMARKS <br /> CODE OR STD. REF. <br /> o CON PER. <br /> a T <br /> GENERAL <br /> INSPECT FASTENING OF ROOF <br /> DECK, ROOF FRAMING <br /> �i CONNECTIONS, WALL 1705.11.3 - - X - <br /> CONNECTIONS TO ROOF AND <br /> .o FLOOR DIAPHRAGMS AND <br /> in o FRAMING. <br /> WOOD <br /> FIELD GLUING OF DIAPHRAGM X <br /> o AND SHEAR WALL ELEMENTS <br /> o CONNECTIONS FOR DRAG <br /> STRUTS,BRACING, AND SHEAR ALL CONNECTIONS VISUALLY <br /> WALL ANCHORAGE AND X INSPECTED <br /> HOLD-DOWNS 1705.11.1 <br /> a FASTENING OF DIAPHRAGM AND ALL FASTENING VISUALLY <br /> SHEAR WALL SHEATHING WITH INSPECTED. NOT REQUIRED <br /> EDGE NAILING 41NCHES ON - - X WHERE THE FASTENER SPACING <br /> E CENTER OR LESS IS MORE THAN 4 INCHES ON IF SHEET IS LESS THAN 22x34 <br /> CENTER REDUCE SCALE ACCORDINGLY <br /> c�w PROJECT ENGINEER: SCALE: <br /> o�� � DWG. No. SB1.3 /� <br /> I � - E N. WATSON AS SHOWN PORT OF EVERETT w <br /> N 5G p4* �l DESIGNED BY: DATE: U) <br /> Port of ��°`° r� N. PALLADINo DATE 2023 CENTRAL MARINA FUEL DOCK CIP NO. <br /> EVERETT 2-°-073-°' 5 <br /> `o DRAWN BY: CHECKED BY: /G�/ <br /> ¢� P.O. BOX 538 16015th Avenue,Suite 1300 ® 04�11�2023 SS ISSUED FOR PERMIT REVIEW � 7 \�9 T. LEMONS S. KLIEB LER NOOOJECTMR-GM-2023-01 Li <br /> Seattle,Washington 98101 ti APPROVED BY STATEMENT OF SPECIAL w <br /> EVERETT, WA 98206 <br /> (425) 259-3164 (206)382-0600 Fax(206)382-0500 ,�� INSPECTIONS <br /> a PROJECT NO.1600120 NO. DATE BY REVISION NO. DATE BY REVISION SHEET NO. 45 OF a <br />
The URL can be used to link to this page
Your browser does not support the video tag.