Laserfiche WebLink
NAILS AT EACH TRUSS AND <br /> PANEL PERIMETER, 8d NAILS <br /> SPACED AT 6" MAX, 1 3/8" <br /> MIN PENETRATION PANEL EDGES <br /> ROOF TRUSS <br /> FOR PANEL DETAILS AT TRUSSES, DOUBLE TOP PLATE 16d NAILS AT 12" OC <br /> II II II•I SEE (INTO EACH HEADER PLY) <br /> 2x STUDS <br /> I SB3.1 SB3.1 TOP AND BOTTOM <br /> HEADER, CONTINUOUS PLATE TO MATCH <br /> DOUBLE TOP SEE SCHEDULE <br /> STUD SIZE, TOP AND BOTTOM <br /> PLATE <br /> !I !I !I !I PANEL "H" CEPS HEADER/WOOD BEAM SCHEDULE <br /> AT LOCATIONS MIN (2) STUDS AT EACH <br /> El El <br /> WITHOUT BLOCKING END OF SHEARWALL DIMENSION LUMBER: <br /> H..x..,Y. <br /> PANEL FIELD NAILING, WHERE:CD x=QTY.OF 2x MEMBERS <br /> 8d NAILS SPACED AT y=NOMINAL DEPTH OF MEMBERS <br /> ROOF SHEATHING 12" MAX, 1 3/8" MIN MARK QUANTITY-SIZE SHOULDERIBEARING FULL HEIGHT SIMPSON HANGER <br /> PANEL PENETRATION STUDS,EACH END, STUDS,EACH END, AT POST <br /> ROUGH OPENING TYPICAL UNO TYPICAL UNO <br /> BLOCK PANEL EDGES SEE ARCH H36 (3(2x6 1-24 1-2x6 HUC26.3 <br /> H3.8 (3)2x8 2-2x6 2-2x6 HUC26-3 <br /> APPLY PANELS IN 4x8 OR SHOULDER STUDS NOTE: IF "D" IS SUCH <br /> 8x4 SHEETS IN STAGGERED <br /> ARRANGEMENTS SHOWN TO BOTTOM PLATE THAT IT CAN <br /> II II II II SEE HEADER ACCOMMODATE IT, A <br /> INTERIOR SUPPORT 1 CONNECTION OF MULTIPLE SCHEDULE SINGLE FULL—DEPTH <br /> MEMBER END POST. SEE HEADER OF EQUAL OR <br /> NAILING SCHEDULE <br /> GREATER DEPTH MAY <br /> II II I I II I FULL HEIGHT STUDS BE USED. <br /> PANEL EDGE NAILING, TO BOTTOM PLATE NOTES: <br /> 8d NAILS SPACED AT 4" MAX, 7 1. SEE HEADER ELEVATION THIS SHEET FOR HEADER DETAILS. <br /> a 1 3/8" MIN PENETRATION SB3.2 SB3.2 SEE HEADER <br /> SCHEDULE <br /> N STAGGER PANEL JOINTS, SUPPORTED PANEL SEE NAILING SCHEDULE FOR ADDITIONAL REQUIREMENTS <br /> o TYP ROOF TRUSSES PERIMETER SILL PLATE ANCHORAGE, <br /> o SHEAR WALL LENGTH—SEE PLAN SEE DETAIL <br /> SB21 SB3.1 <br /> 1 DIAPHRAGM DETAIL 2 SHEAR WALL ELEVATION 3 HEADER ELEVATION AND SCHEDULE <br /> SB3.2 SB3.2 SCALE: 1/2" 1'-0" SB3.2 SB3.2 SCALE: 3/8" 1'-0" SB3.2 SB3.2 SCALE: 3/4" = 1'-0" <br /> N <br /> N NAILING SCHEDULE <br /> SHEAR WALL END POST. <br /> CUTS, NOTCHES AND BORED BUILDING ELEMENT NAILS NUMBERB LOCATION <br /> 73 HOLES ARE PROHIBITED AT WALL FRAMING <br /> L� ALL SHEAR WALL END POSTS STUD TO SILL PLATE 8d COMMONli6d COMMON 4 TOE NAILI2 END NAIL <br /> STUD TO CAP PLATE i6d COMMON 2END NAIL OR DIRECT 4'-0" MIN SPLICE <br /> DOUBLE STUDS IOd COMMON 8"O.C.FACE NAIL (8'-0" MIN BET SPLICES) <br /> — CORNER STUDS ifid COMMON 24"O.C.FACE NAIL <br /> SILL PLATE TO JOIST/BLOCKING 16d COMMON 16"D.C.FACE NAIL SIMPSON HDU8—SDS2.5 <br /> DOUBLE TOP PLATE 10d COMMON 12"O.C.FACE NAIL HOLD—DAWN, EAQH END <br /> 0 TOP PLATE LAPS 10d COMMON 3FACE NAIL OF SHEAR WALL <br /> w <br /> RAFTER FRAMING 7/8" DIA HAS 2x BOTTOM PLATE <br /> o BORED HOLE THREADED ROD <br /> MAXIMUM DIA 609 RAFTER TO PLATE 8d COMMON 3TOE NAIL <br /> % OF STUD DEPTH RAFTER TO RIDGE 16d COMMON 2 TOE NAIL OR FACE NAIL <br /> 2x4 = 1 7/16" DIA <br /> JACK RAFTER TO HIP 10d COMMONli6d COMMON 3 TOE NAIL12 FACE NAIL GONG CURB <br /> o 2x6 = 2 3/16" DIA JOIST FRAMING <br /> o p JOIST TO PLATE OR GIRDER Bd COMMON 3TOE NAIL <br /> TOP OF FLOAT <br /> 5/8" MINIMUM CEILING JOIST TO PLATE 8d COMMON 3TOE NAIL <br /> = TO EDGE (TYP) CEILING JOIST LAP 16d COMMON 3FACE NAIL <br /> o j CEILING JOIST TO RAFTER 16d COMMON 3FACE NAIL NAILING INSTRUCTIONS: <br /> II <br /> y 2X STUD, TYP MISCELLANEOUS <br /> �.o BRIDGING 8d COMMON 2 TOE NAIL EACH END TOP PLATE TO LOWER PLATE: 12-16d NAILS a <br /> BLOCKING ad COMMON 3TOE NAIL,ALL3 SIDES (2 ROWS OF 6 EQUALLY SPACED NAILS) d. <br /> IF HOLE IS BETWEEN 40% AND 60% ° <br /> cj OF STUD DEPTH, THEN STUD MUST BE BUILT-UP GIRDER 20dCOMMON 32"O.0 FACENAIL,2ROW3 EMBED 4" IN HILTI ° <br /> N DOUBLE AND NO MORE THAN TWO STAGGERED ONOPP.SIDES LOWER PATE TO TOP OF STUDS: (2) 20d HIT—RE 500 V3 <br /> o SUCCESSIVE STUDS ARE DOUBLED AND CONTINUOUS HEADER TO STUD 8dCOMMON 4 TOE NAIL NAILS AT EACH STUD <br /> SO BORED. CONTINUOUS HEADER,2 PIECES 16d COMMON 16"O.C.FACE NAIL,2 ROWS <br /> NOTE:THIS SCHEDULE IS BASED UPON THE"FASTENING SCHEDULE"IN IBC 2018.ANY QUESTIONS OR ITEMS NOT <br /> HOLELIMITATIONS FOR INCLUDED ON THE ABOVE SCHEDULE SHALL BE BROUGHT TO THE ENGINEER'S IMMEDIATE ATTENTION. <br /> 0 4 EXTERIOR AND BEARING WALLS 5 NAILING SCHEDULE 6 TOP PLATE SPLICE 7 SHEAR WALL HOLD-DOWN DETAIL <br /> S133.2 SB3.2 SCALE: 1/2" = 1'-0" S133.2 SB3.2 SCALE: 3/4" = 1'-0" SB3.2 SB3.2 SCALE: 3/4" = 1'-0" SB3.2 SB3.2 SCALE: 1 1/2" = 1'-0' <br /> IF SHEET IS LESS THAN 22x34 E <br /> REDUCE SCALE ACCORDINGLY <br /> c�w PROJECT ENGINEER: SCALE: <br /> o�� � DWG. N0. SB3.2 E. N. WATSON AS SHOWN PORT OF EVERETT w <br /> Port Of' S�$p4� `�°` DESIGNED BY: DATE: CENTRAL MARINA FUEL DOCK <br /> 04/11/2023 CIP NO. <br /> EVERETT 2-0-073-01 5 <br /> `o DRAWN BY: CHECKED BY: /G�/ <br /> ¢� P.O. BOX 538 16015th Washington 9811 ® 04/11/2023 SS ISSUED FOR PERMIT REVIEW � 7 \�9 T. LEMQNS S. KU EB LER NOOOJECTMR—GM-2023-01 Li <br /> Seattle,Washington 98101 ti APPROVED BY STRUCTURAL BUILDING w <br /> EVERETT, WA 98206 <br /> o i (425) 259-3164 (206)382-0600 Fax(206)382-0500 �� DETAILS <br /> a PROJECT NO.1600120 NO. DATE BY REVISION NO. DATE BY REVISION SHEET NO. 49 OF a <br />