My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
610 14TH ST 2025-04-01
>
Address Records
>
14TH ST
>
610
>
610 14TH ST 2025-04-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 7:13:18 AM
Creation date
2/10/2025 10:54:18 AM
Metadata
Fields
Template:
Address Document
Street Name
14TH ST
Street Number
610
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL NOTES: <br /> ' 1. REQUIREMENTS OF OTHER DIVISIONS APPLY TO DIVISION 26 <br /> IL_ -JJJ DEMOLITION. SEE SPECIFICATIONS. <br /> GATE 1 GATE 2 <br /> EXISTING <br /> YACHT CLUB (E) UNIT SUB 'B' (E) UNIT SUB 'C' <br /> EX MARGINAL FLOAT 1 EX MARGINAL FLOAT 2 <br /> FLAG NOTES: <br /> 1. EXISTING FUEL FLOAT& A-DOCK: REMOVE EXISTING <br /> ELECTRICAL EQUIPMENT AND CIRCUITS. REMOVE EXISTING <br /> 200A, 48OV, 3P, FEEDER ON MARGINAL FLOAT 1, <br /> 2 GANGWAY, AND GATE 1 APPROACH PIER, BETWEEN A-DOCK <br /> AND DISCONNECT'B'. <br /> 2.EXISTING B-DOCK: REMOVE EXISTING ELECTRICAL <br /> EQUIPMENT AND CIRCUITS. DEMOLITION INCLUDES UNIT <br /> SUBSTATION 'B' AND 480V FEEDER FROM SUBSTATION 'B' <br /> TO SUBSTATION 'C'. <br /> W <br /> z <br /> J <br /> O <br /> Q <br /> W <br /> S <br /> 1r <br /> W <br /> d 1 <br /> X <br /> O <br /> Of <br /> a <br /> a <br /> EXISTING <br /> FUEL DOCK <br /> I <br /> wl <br /> 0 <br /> CENTRAL GUEST DOCK 3 A—DOCK <br /> <i B-DOCK C-DOCK D-DOCK <br /> 0 <br /> d <br /> 0 0 <br /> N <br /> o� <br /> ELECTRICAL SITE PLAN — DEMOLITION <br /> o� <br /> J�I <br /> 40' 0 40' 80' VFRT DATUM: NAVD 88 <br /> CONV TO MLLW = NAVD88+2.03 <br /> HRRBOR POWER HORZ DATUM: NAD 83/91 <br /> ieNCINeeas, INC. 20 60' <br /> III <br /> SCALE: 1"=40' IF SHEET IS LESS THAN 22x34 <br /> n- <br /> PM: ED DAVID, PE TEL: zos.ass.4soo REDUCE SCALE ACCORDINGLY <br /> o PROJECT ENGINEER: SCALE: <br /> E. DAVID 1" = 40' PORT OF EVERETT DWG. NO. <br /> E3.0 w <br /> cn <br /> E. DAVID 04/11/2023 <br /> Port of DESIGNED BY DATE- <br /> E. MARINA FUEL DOCK cIP No. <br /> o� � <br /> > DRAWN BY: CHECKED BY <br /> EVERETT : 2-0-073-01 <br /> a i 1601 5th Avenue,Suite 1300 J. CAMPBELL E. DAVID PROJECT <br /> P.O. Box 538 No MR—CM-2023-01 <br /> Seattle,Washington 98101 A 04/11/2023 EJD ISSUED FOR PERMIT REVIEW APPROVED BY: E L E C T R I C A L <br /> EVERETT, WA 98206 W <br /> (206)382-0600 Fax(206)382-0500 <br /> p/ (425) 259-3164 PROJECT NO.1600120 NO. DATE BY REVISION NO. DATE BY REVISION SITE PLAN DEMOLITION SHEET NO. OF <br /> a ti <br />
The URL can be used to link to this page
Your browser does not support the video tag.