Laserfiche WebLink
7I LEGEND <br /> W <br /> w X YZZ X POWER PEDESTAL <br /> 1/2 N �/ V= VOLTAGE (WHEN USED) <br /> W= SLIP NUMBER(S) SERVED <br /> 2" SQ. GALV. TUBE STEEL RACK 30 BA-430 X = 30 = 30A,120V OUTLET <br /> WELDED, WITH WELDED END CAPS \ X = 50 = 50A,120/240V OUTLET <br /> X = 100 = 100A,120/240V OUTLET <br /> WIDTH REQ'D BY(E) ANCHORS \ \ / Y= UNIT SUBSTATION <br /> \ Z = CIRCUIT NUMBER <br /> z_ <br /> DISCONNECT'B' \ \ : APPROXIMATE PEDESTAL PLACEMENT LOCATION <br /> x <br /> 3/4 U <br /> 1 5/8" GALV. STRUT 306A-430 Q <br /> NOTE: 'X' DESIGNATES OUTLET PER SLIP. (i.e. 30/50) <br /> WELDED TO FRAME FOR INDICATES MULTIPLE OUTLETS PER SLIP. <br /> CONDUIT MOUNTING \ \ <br /> HARDWARE. PROVIDE AS RES \\ \ <br /> NECESSARY FOR --- <br /> FASTENING EQUIPMENT. \ \ <br /> \ \ El MINIMUM <br /> BOX - IN FLOAT; UL LISTED <br /> MINIMUM 30"x17"08"D LOW (P=POWER/C=COMMUNICATIONS) <br /> 6'-6"MAX <br /> --- 6 5/ <br /> 30 B POLE MOUNTED LUMINAIRE; SEE LUMINAIRE SCHED. SHT. EO.O <br /> 8" SQ. GALV. (WELDED) 1 5/8" GALV. STRUT WELDED <br /> STEEL BASEPLATE TO FRAME FOR CONDUIT \ \ <br /> MOUNTING HARDWARE. PROVIDE \ \ O LUMINAIRE; SEE LUMINAIRE SCHEDULE <br /> AS NECESSARY FOR FASTENING \ <br /> FINISHED - -- EQUIPMENT. \. \ ❑E FIRE PEDESTAL <br /> GRADE <br /> (E) CONCRETE PAD --- ELECTRICAL CHASES - INSIDE FLOAT(SEE DETAILS) <br /> KE <br /> _p_ PORTABLE POWER CABLE - NOTE: CABLES NOT ALWAYS SHOWN. <br /> SEE SINGLE LINE WIRING DIAGRAM FOR CONNECTIONS. <br /> TO PUD TO DOCK & 7/8 <br /> POLE PANEL CM2 30 A-430 - <br /> EXISTING RACEWAY OR CHASES <br /> \ <br /> DISCONNECT 'B' ELEVATION <br /> E4.1 <br /> 9/10 <br /> 30 BA-4 30 <br /> (E) FUEL DOCK DISCONNECT AND <br /> CONTROLS TO BE REMOVED; SEE \ \ <br /> DETAIL 1, THIS SHEET. \ \ <br /> \ <br /> - r <br /> 0 0 <br /> , <br /> orrrerra. _ 30 BA-4 30 <br /> m <br /> 0 <br /> c R \ o 0 <br /> \ <br /> U <br /> O <br /> d <br /> 00 <br /> PHOTO — DISCONNECT 'B' N <br /> �I EXISTING FUEL <br /> I <br /> DOCK 20' 0 20' 40' VERT DATUM: NAVD 88 <br /> CONV TO MLLW = NAVD88+2.03 <br /> HRRBOR POWER HORZ DATUM: NAD 83/91 <br /> f N 6 N E E R 5, I N(. ELECTRICAL PLAN — EXISTING FUEL DOCK 0' 30' <br /> SCALE: 1"=20' IF SHEET IS LESS THAN 22x34 <br /> n- <br /> PM: ED DAVID, PE TEL: 206.855.4600 REDUCE SCALE ACCORDINGLY <br /> 0 PROJECT ENGINEER: SCALE: <br /> E. DAVID 1° = 20' PORT OF EVERETT DWG. NO. <br /> E4.0cn <br /> W <br /> Port of DESIGNED BY- DATE- CENTRAL MARINA FUEL DOCK <br /> o� E. DAVID 04/11/2023 cIP No. � <br /> 2-0-073-01 C <br /> > VERETT DRAWN CHECKED C <br /> a i 1601 5th Avenue,Suite 1300 J. CAMPBELL E. DAVIDID PROJECT <br /> P.O. BOX 538 Seattle,Washington 98101 04/11/2023 EJD ISSUED FOR PERMIT REVIEW APPROVED BY <br /> ELECTRICAL PLAN - EXISTING NO. MR-CM-2023-01 <br /> EVERETT, WA 98206 W <br /> (206)382-0600 Fax(206)382-0500 <br /> o i (425) 259-3164 PROJECT NO.1600120 No. DATE ev REwsioN No. DATE er REvisioN FUEL DOCK <br /> SHEET NO. OF <br /> a ti <br />