My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3200 CEDAR ST 2025-03-24
>
Address Records
>
CEDAR ST
>
3200
>
3200 CEDAR ST 2025-03-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:56:16 PM
Creation date
2/10/2025 11:37:36 AM
Metadata
Fields
Template:
Address Document
Street Name
CEDAR ST
Street Number
3200
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KEYED NOTES <br /> O, ALLOW 3 FEET OR MORE OF <br /> CLEARANCE BETWEEN <br /> Lo 5 o FEET 10 20 CABINETS, <br /> I 2O SEE DRAWING EZ01-EZ03 FOR <br /> BLDG <br /> s61 <br /> CABINET CONDUIT STUB-UP <br /> e1 I BLDG LOCATIONS AND DETAILS. <br /> s i S s • CHARGER CABINETS AND PANEL <br /> a <br /> �- <br /> xx—x � � SHALL BE INSTALLED ON A 4" <br /> ❑ ❑ ❑ ❑ HOUSING KEEPING PAD. <br /> E I \ I x O3 CONTRACTOR IS RESPONSIBLE <br /> El El ❑ Lm I FOR POT HOLING AND <br /> Jm LOCATING EXISTING <br /> 8 I i —xx UNDERGROUND UTILITIES <br /> / PRIOR TO THE INSTALLATION OF <br /> 8 0 } I NEW CONDUITS/DUCTBANKS. <br /> Q I I O4 CONTRACTOR TO COORDINATE <br /> WITH EVERETT TRANSIT AND <br /> I > I x MOMENTUM DYNAMICS(MD) <br /> g / TO CONFIRM THE LOCATION OF <br /> � EACH GA TRANSMITTING COIL <br /> WITH THE GILLIG BUSS <br /> RECEIVING PAD PRIOR TO <br /> I <br /> I 2 INSTALLATION. <br /> 30OKW O <br /> FUTURE <br /> CHARGER NOA GA COIL I O INSTALL REMOVABLE BOLLARDS <br /> x TO ALLOW CLEARANCE FOR <br /> GA COIL33"Wx3S"L MAINTENANCE ACCESS. <br /> I (3)-3"CONDUITS (TYP OF 4) <br /> I xl M 33"Wx3S"L REMOVABLE BOLLARDS SHALL <br /> g <br /> g WITH GA COILS (3)-3"CONDUITS FOR I BE NO MORE THAN 5FT APART <br /> (TYP OF 6) (TYP OF 6)O COIL 10 FUTURE GA COILS x AND A MAXIMUM OF 4FT FROM <br /> _�J (TYPOF4) CHARGING CABINETS AND <br /> 125 COIL COI 3 COIL4 COILS COIL COIL COILS COIL <br /> ° COIL 1 �(/ <br /> I xl 125 � � �; PANELBOARD". <br /> b xi 3U °� ,— __� - - 6O PROVIDE PERIMETER GROUND <br /> __ _ _ _ _ _ _ __ _ __ \� n —— — � _ RING(H4/0 COPPER)WITH(4) <br /> — — — — — — — — — — — — — — — — — —— — — = 3/4"x10'GROUNDRODS. <br /> I <br /> 1 I o o11 <br /> ° <br /> s <br /> b 3 tJ Oo FUTURE 300KW 2 6 <br /> I I 6 150KW E03 CHARGER NO.3 <br /> 2 I x <br /> G �CHARGER NO.2 o 125F O <br /> >- I PANELBOARD"S" ° <br /> Q i 125 g 12 F FUTURE _ <br /> I Z 5 1 30 PANELBOARD"N" B III x <br /> F. > I BOLLARD(TYP) <br /> E04 <br /> /� I <br /> N g � I �O _ E03 �J <br /> B � I <br /> a 1' _ <br /> CE <br /> APPROVED �SWITCHBOSERVIARD O <br /> a I / PUBLIC WORKS DEPARTMENT 1600 O <br /> II / BY: Tawnya Herman A <br /> I DATE: 10/11/2022 Eo3 <br /> s g I CITY OF EVERETT REVIEWED FOR PERMIT <br /> o <br /> 8 I b <br /> r, y I I Reviewed and approved for <br /> B ~� EXISTING PUD <br /> m / pavement replacement Only. SERVICE VAULT <br /> F I i AND TRANSFORMER j <br /> aL-------- g- - ---P--------------------------- ---------".i------�--------------+-----------x---------------- <br /> l — <br /> b <br /> o? <br /> E I /� PINE ST - - <br /> s°o Ooigmd 0-0l; <br /> eo 04, <br /> E�CON EVERETT BEB INDUCTIVE CHARGER E-ELECTRICAL E02 <br /> KPI� ASSOCIATES INC. PUBLIC WORKS INSTALLATIONsl eV�T <br /> NO. DATE APRVD REVISION Dmope" Ie.P' BUS CHARGERS LAYOUT ELECTRICALPLANS ISSUED FOR r 320ett,WA 820 tiEverett WA 98201 <br /> BID CONST RECORD SITE PLAN�abn per,-�9?IKK Nww.9lcan.com 425.257.8800 everettwo.gov REGION-10 J STATE-WA f FEDERAL AID#-RgBpMMq <br /> a°LL ACTION DATE APRVD ACTION DATE APRVD ACTION DATE APRVD OfPtal <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always verify Scal <br />
The URL can be used to link to this page
Your browser does not support the video tag.