My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7704 CASCADE DR 2025-03-24
>
Address Records
>
CASCADE DR
>
7704
>
7704 CASCADE DR 2025-03-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 8:22:25 AM
Creation date
2/10/2025 11:46:19 AM
Metadata
Fields
Template:
Address Document
Street Name
CASCADE DR
Street Number
7704
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT Date Applied: 7/12/2022 <br /> City of Everett Permit Services Public Works Permit#: PW2207-006 <br /> 3200 Cedar Street, 2"d Floor Associated Bldg Permit#: <br /> EVERETT <br /> Everett, WA 98201 Planning Reference#: <br /> WASHINGTON 425-257-8810 Public Works Fee: $225.60 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> JAY ZAMORA JAY ZAMORA <br /> 7704 CASCADE DR 7704 CASCADE DR <br /> EVERETT,WA, 98203-6502 EVERETT,WA, 98203-6502 <br /> PHONE: PHONE:42S4269492 <br /> TAX PARCEL ID#:00393600200501 SITE ADDRESS:7704 CASCADE DR <br /> DESCRIPTION:PERMIT GRAVELED AREA IN REAR YARD AREA <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and Specifications <br /> for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department.Approved plans must remain on job-site at <br /> all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally request all <br /> required inspections.A handout is provided at permit issuance with instructions on how to request an inspection online. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and per the direction of the PW Inspector and the approved <br /> SWPPP/TESC Plan. Remove upon completion of the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times. No dirt,mud,rocks,or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities during construction. <br /> 9. Any damage to City improvements(sidewalk,curb, roadway,etc.)shall be replaced per City Standards and/or as directed by the City PW <br /> Inspector. <br /> 10. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfaces will be managed on- <br /> site in a manner that does not adversely affect neighboring properties,including the City's right-of-way and/or easements and the <br /> improvements located therein. <br /> 11. Prior to any interruption to the public right-of-way(roadways,parking lanes,or sidewalks)a Traffic Street Use permit shall be obtained <br /> from the City's Traffic Engineering Division.This permit can be applied for online at pw.everettwa.gov and requires a traffic control plan to be <br /> submitted for the area of requested closure. Please allow 1-2 weeks for TSU permit issuance from the date of application. <br /> 12.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by <br /> selecting PW 25-Site Final/Permit Close Out within the Online Permitting Portal Inspection Requests for this permit when all items have been <br /> completed. <br /> 13. All work constructed within the public right-of-way must be removed or relocated at the owner's expense if the City ever requires use of <br /> the right-of-way for municipal purposes. <br /> Public Works Permit Fee Breakdown: <br /> Paving(525SF).................................................$45.00 <br /> PW Plan Review...............................................$20.00 <br /> PW Site Inspection..........................................$20.00 <br /> Stormwater System Development Fee.........$140.60 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> By purchasing this permit and commencing work,the owner/applicant <br /> hereby agrees to hold and save harmless the City of Everett from any <br /> and all claims for damages,costs,expenses,or causes of action that <br /> may arise because of installation and maintenance the <br /> 07�12�2022 improvement or other right-of-way use here to applied for and further <br /> agrees to remove same upon notice from the City and to replace <br /> Approved for Construction, Public Works Dept. Date public property damaged thereby. <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BEDILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAY BE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br /> —APPLICANT/JOB SITE COPY _TREASURER _ADDRESS FILE <br />
The URL can be used to link to this page
Your browser does not support the video tag.