Laserfiche WebLink
0 Task 2: Select where the project will discharge its stormwater <br /> R An existing piped conveyance system <br /> ❑ Outlet protection such as rip-rap pad (less than 0.3 CFS) <br /> ❑ Dispersion trench or other dispersion facility(0.3 to 0.75 CFS) <br /> ❑ Piped conveyance to appropriate discharge location with easement if required <br /> (greater than or equal to 0.75 CFS) <br /> ❑ Other:-------------------------------- <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report-Dec 2019 16 <br />