My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11327 2ND AVE SE 2025-03-24
>
Address Records
>
2ND AVE SE
>
11327
>
11327 2ND AVE SE 2025-03-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 8:25:58 AM
Creation date
2/10/2025 1:27:37 PM
Metadata
Fields
Template:
Address Document
Street Name
2ND AVE SE
Street Number
11327
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 3: List#1 approach to MR #5 compliance <br /> You are required to use the first applicable BMP that is considered feasible in each <br /> 0 category(lawn, landscape, and hard surfaces) below. Mark whether the BMP is feasible or <br /> infeasible. If you selected infeasible,cite the reasons for infeasibility(see Worksheet 2) <br /> and or a professional, site specific reference to supporting documentation (such as a <br /> geotechnical report). <br /> List#1: On-Site Stormwater Management BMPs for MR #1-5 Projects <br /> Feasible Infeasible If infeasible provide justification <br /> BMP T5.13: Post-Construction Soil Quality <br /> and Depth F_ I existing drain pipe <br /> Feasible Infeasible If infeasible provide justification <br /> BMP T5.10A: Downspout Full Infiltration* *Soils report required for this BMP <br /> or <br /> BMP 5.30: Full Dispersion <br /> BMP T5.14A: Rain Gardens* L *Soils report required for this BMP <br /> or <br /> BMPT7.30: Bioretention Cells,Swales, <br /> and Planter Boxes <br /> BMP T5.1013: Downspout Dispersion <br /> Systems <br /> BMP T5.10C: Perforated Stub-out <br /> Connections <br /> Feasible Infeasible If infeasible provide justification <br /> BMP T.530: Full Dispersion <br /> BMP T5.15: Permeable Pavements* F *Soils report required for this BMP <br /> or <br /> BMP T5.14A: Rain Gardens* — <br /> or <br /> BMPT7.30: Bioretention Cells,Swales, <br /> and Planter Boxes <br /> BMP T5.12: Sheet Flow Dispersion — —I <br /> or <br /> BMP T5.11: Concentrated Flow Dispersion —1 L <br /> *If you selected BMP T5.10A Downspout Full Infiltration submit 1 and 3 below. <br /> *If you selected BMPT5.15 Permeable Pavement, or T5.14A Rain Gardens in List#1,on-site soils information for sizing <br /> or infeasibility determination is required from 1 through 4 below. <br /> Submit the following information to Permit Services with this report: <br /> 1) A USDA Custom Soil Report from websoilsurvey.sc.egov.usda.gov <br /> 2) Small-scale Pilot Infiltration Tests(PIT)per SWMMWW specifications <br /> 3) USDA Soil Type(s)= <br /> 4) Measured Infiltration Rate=---__-----in/hr(from PIT) <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report-Dec 2019 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.