Laserfiche WebLink
ROOT DOWNSPOUT BMPS <br /> Roof downspout BMPs include infiltration trenches,dry wells, and partial dispersion systems <br /> BMP T5.10A Roof Downspout Full Infiltration <br /> Downspout full infiltration systems are trench or drywell designs intended for use in infiltrating runoff from <br /> roof downspout drains. <br /> Infiltration Trench <br /> The minimum trench length is based upon the soil type in the location of the infiltration trench. <br /> The soils report will provide the USDA Soil Type. The table below provides the minimum trench <br /> length per 1,000 ft2 of contributing roof area. Roof downspout infiltration trenches shall be <br /> designed in accordance with the SWMMWW. <br /> "Coarse sand"(more than 50%of sand fraction remains on#4 sieve) 20 <br /> "Medium sand" (more than 50%of sand fraction remains on#40 sieve) 30 <br /> Loamy sand 75 <br /> Sandy loam I 125 <br /> Loam I 190 <br /> Silt loam 275 <br /> Fill (only per SWMMWW requirements) 60 <br /> Trench length required (ft) = Roof area (ft2) *((minimum trench length) (ft)) <br /> 1000 (ft2) <br /> ■ Roof area requiring mitigation (ft2):_______________ <br /> ■ USDA Soil Type per soils report: -------________ <br /> ■ Trench length required:----------- ___ <br /> (Trench length cannot exceed 100 ft. If length exceeds 100 ft,multiple trenches will be required.) <br /> ■ Number of trenches: <br /> ---------------- <br /> ■ Length of each trench:----_--------_ <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report-Dec 2019 38 <br />