My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11327 2ND AVE SE 2025-03-24
>
Address Records
>
2ND AVE SE
>
11327
>
11327 2ND AVE SE 2025-03-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 8:25:58 AM
Creation date
2/10/2025 1:27:37 PM
Metadata
Fields
Template:
Address Document
Street Name
2ND AVE SE
Street Number
11327
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOURCES: Portion of total amendment quantity(from line 11)that is: <br /> 12. Purchased from off-site sources ..................................................................... ---_____% <br /> 13. Stockpiled soil and duff from on-site ................................................................ ---_____% <br /> 14. Chipped and stockpiled woody material from on-site ........................................... % <br /> 15. Imported topsoil .......................................................................................... --------% <br /> 16. CHECK:The total of lines 12 through 15 should total 100% ................................... 100% <br /> PLANTING BEDS <br /> 17. Area of landscaping and planting beds (from line 4 above) .................................... -----------ft2 <br /> a. Multiply by conversion factor from 3 inches to cubic yards (yd3): x 0.0093 <br /> 18. MULCH QUANTITY NEEDED ............................................................................. -------------yd3 <br /> SOURCES: Portion of total mulch quantity(from line 18)that is: <br /> 19. Purchased from off-site sources............................................................................ ----------% <br /> 20. Chipped and stockpiled woody material from on-site .............................................. _---------% <br /> 21. CHECK:The total of lines 19 and 20 should total 100% ......................................... 100% <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report-Dec 2019 43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.