My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11327 2ND AVE SE 2025-03-24
>
Address Records
>
2ND AVE SE
>
11327
>
11327 2ND AVE SE 2025-03-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 8:25:58 AM
Creation date
2/10/2025 1:27:37 PM
Metadata
Fields
Template:
Address Document
Street Name
2ND AVE SE
Street Number
11327
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 3. COMPLETE MINIMUM REQUIREMENTS #1-5 <br /> The following subsections address MR #1-5. The more information provided in these subsections typically <br /> corresponds to faster review and permit issuance times. Submitted checklists that lack the necessary <br /> information for review are considered incomplete and will be returned unprocessed to the applicant. <br /> MR #1: Preparation of Stormwater Site Plan <br /> The purpose of MR #1 is to convey all relevant information about the proposed project to the City for review <br /> to ensure the project is in compliance with the current City and State stormwater management standards. <br /> This is your opportunity to inform the reviewer about the project fundamentals as well as highlight the <br /> significant and insignificant aspects of the project with regards to stormwater management. <br /> Task 1: Describe existing site conditions <br /> Provide description of existing site conditions: <br /> fenced in flat lot <br /> Describe existing structures (location,type): <br /> Describe slopes on your site (flat, rolling, steep, <br /> flat <br /> Describe hard surfaces (roof, ground treatment): <br /> none <br /> Describe vegetative surfaces (location,quanity ft2): <br /> grass <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report-Dec 2019 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.