My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
909 SE EVERETT MALL WAY CRUCIBLE BREWERY 2025-03-28
>
Address Records
>
SE EVERETT MALL WAY
>
909
>
CRUCIBLE BREWERY
>
909 SE EVERETT MALL WAY CRUCIBLE BREWERY 2025-03-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 7:30:51 AM
Creation date
2/10/2025 1:32:42 PM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
909
Tenant Name
CRUCIBLE BREWERY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- Pipe) <br /> Exhaust <br /> Concentric Pipe Overview <br /> Combustion Combustion <br /> air air <br /> Combustion air and exhaust vent directly <br /> through a single concentric connection. <br /> Hot exhaust exits through the interior tube, <br /> while combustion air enters through the <br /> outer layer. <br /> Concentric Pipe Termination Clearances Figure 23: Concentric Pipe <br /> � 60 in.(1.52 m) <br /> Note:24 in.(0.61 m) <br /> to wall or parapet <br /> 12 in. <br /> (0.30 m) <br /> 12 in. <br /> (0.30 m) <br /> 60 in.(1.52 m)vertically <br /> between terminals <br /> Figure 24:Between terminals at <br /> nside different levels <br /> Corner <br /> 12 in.(0.30m) <br /> Figure 22: Concentric Pipe Termination Clearances 2 6 <br /> Figure 25:Between terminals at same <br /> level <br /> All terminations (horizontal and/or vertical) must terminate 12 in. (0.30 m) above grade or anticipated <br /> snow level. <br /> Rinnai Tankless Water Heater Installation and Operation Manual 37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.