My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9700 HOLLY DR 2025-07-10
>
Address Records
>
HOLLY DR
>
9700
>
9700 HOLLY DR 2025-07-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2025 7:54:00 AM
Creation date
2/14/2025 1:24:14 PM
Metadata
Fields
Template:
Address Document
Street Name
HOLLY DR
Street Number
9700
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C t <br /> D B S =— Mukilteo School District <br /> unemesemmo <br /> since 1895 <br /> sequence and in accordance with the specification documents as provided herein, <br /> deviations will only be allowed under direction of the General Contractor or Owner. <br /> 12.Bid sheets have been provided and shall be completed in full. Unit costs must be <br /> provided for additional/optional items that are reasonably foreseen as being required for <br /> the roof installation. Any expected latent or concealed site conditions should be identified <br /> upfront with unit pricing. <br /> 13. Bidders are reminded that the General Contractor is purchasing the Garland roof system <br /> materials for this project. Bidders should adjust profit and overhead accordingly as they <br /> are not incurring the expense of the materials,but will still need to handle the materials and <br /> load the roof once the materials arrive to the site. <br /> 14.Bidders are reminded that the freight for the General Contractor supplied materials will be <br /> paid for by the General Contractor and will not be an expense to the Bidder. <br /> 15. Bidders are reminded that sales or use tax on the General Contractor supplied materials <br /> will be paid for by the General Contractor and will not be an expense to the Bidder. <br /> 16. Bidders are responsible for all materials not supplied by the General Contractor,as well as, <br /> the associative costs for freight and sales or use taxes, if applicable. <br /> 17.As a general contractor, Garland/DBS can choose to award subcontract based upon any <br /> combination of price, qualifications, past performance, schedule and availability. The <br /> Owner and Garland/DBS have the right to accept or reject any or all subcontractor quotes <br /> for any reason. Prospective subcontractor(s)shall have no legal recourse against the Owner <br /> and Garland/DBS for the acceptance or rejection of any subcontractor quote <br /> 18. This project and all contracts affiliated are being used through Garland/Garland DBS Inc's <br /> US Communities contract through OMNIA with Racine County as lead agency. <br /> ©2010,Design-Build Solutions,Inc. <br /> All trademarks and registration marks appearing in this document are the property of <br /> The Garland Company,Inc.or Garland Canada,Inc.,unless specifically noted otherwise. <br /> ©2010 by Garland Industries. <br />
The URL can be used to link to this page
Your browser does not support the video tag.