My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1525 75TH ST SW CASCADE COFFEE 2025-04-23
>
Address Records
>
75TH ST SW
>
1525
>
CASCADE COFFEE
>
1525 75TH ST SW CASCADE COFFEE 2025-04-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2025 10:54:20 AM
Creation date
2/14/2025 1:35:20 PM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1525
Tenant Name
CASCADE COFFEE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • <br /> } <br /> CITY OF EVERETT <br /> EVERETT Permit Services <br /> WASHINGTON <br /> February 15, 2023 <br /> Mr. Dennis Stickles <br /> Northwest Handling Systems <br /> 1100 SW 7th Street <br /> Renton, WA 98057 <br /> Email Address: neilm@nwhs.com <br /> RE: Owner: Johnson Properties LLC <br /> Job Address: 1525 75th Street SW, Suite 100 <br /> Plan Check Number: B2212-049, First Building Review <br /> Dear Mr. Stickles, <br /> The proposed project has been reviewed for compliance with the provisions of the building codes <br /> adopted and amended by the state of Washington and the city of Everett. The comments below <br /> must be addressed before a permit can be issued. These comments address building issues only. <br /> Additional revisions or additions may be required by other departments including Public Works, <br /> Planning, and Fire. <br /> Code citations provided in the following review comments reference the Everett Municipal Code <br /> (EMC), the 2018 International Building Code (IBC), the 2018 International Existing Building Code <br /> (IEBC), 2018 the Washington State Energy Code (WSEC), and the 2018 International Mechanical <br /> Code (IMC). Additional reference standards are listed in IBC Chapter 35. Amendments to the <br /> adopted building codes by Washington Administrative Code (WAC) Title 51 are incorporated into <br /> the referenced code citations. <br /> In order for the processing of your application to continue, the following documentation shall be <br /> submitted to the Building Division for review: <br /> a. Itemized letter addressing the comments provided below. <br /> b. Two complete sets of revised construction drawings. <br /> c. Two copies of supplemental structural calculations. <br /> Submittal documents shall contain sufficient information and detail to review the proposed project <br /> for compliance with the adopted codes. Upon submittal of the revised documents, your application <br /> will be given priority and plan reviews will recommence. <br /> Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.