Laserfiche WebLink
: EC L1 PS E <br /> ENGINEERING <br /> Project: Applied Mat-CMS5398 <br /> Project#: 22-12-166 <br /> Stair Post Connection ProjDate: 3/20/2023 <br /> Engineer: CCL <br /> Page: 1 of 1 <br /> Welded Connection <br /> Post: Pipe 1-1/4 Std. <br /> Fbase= 36 ksi <br /> FExx= 70 ksi <br /> Wfaiet= 0.250 in(All Around) <br /> Sweld= 0.37 in3 <br /> Mbase= 6.12 k*in <br /> RR= 16.7 ksi <br /> Weld Matl. LZ=2 Base Matl. Li=1.67 <br /> Rn 42 ksi 36 ksi <br /> Rn/S2: 21 ksi 21.6 ksi <br /> I RR /Re: 0.79 <1--OK 0.77 <_1--OK I <br /> Rn(Weld) = 0.6FExx Mbase <br /> RR = <br /> Sweld <br /> Bolted Connection <br /> Bolts: 5/8"-A325 <br /> No.Bolts= 4 per Footplate <br /> S2= 2 <br /> Fnt= 90 ksi <br /> db= 0.625 in <br /> Ab= 0.3068 in2 <br /> Plwidth= 4.5 in <br /> ecc.= 2.25 in <br /> Mbase= 4.68 k*in <br /> RR= 2.08 k(Total) <br /> RR= 0.52 k(per Bolt) <br /> Rn= 27.61 k(per Bolt) <br /> Rn/S2= 13.81 k(per Bolt) <br /> I RR/Re: 0.04 51—OK I <br /> Rn = FntAb RR = Mbase R _ Rn <br /> ecc c — <br /> 80/81 <br />