My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7400 HARDESON RD SUNBELT RENTALS 2025-03-24
>
Address Records
>
HARDESON RD
>
7400
>
SUNBELT RENTALS
>
7400 HARDESON RD SUNBELT RENTALS 2025-03-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 1:38:27 PM
Creation date
2/14/2025 1:56:13 PM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7400
Tenant Name
SUNBELT RENTALS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL OBSERVATION REPORT MAYES I lrerracon <br /> Report Number: M7221748.00O4 <br /> Service Date: 01/13/23 20225 Cedar Valley Rd Ste 110 <br /> Report Date: 01/17/23 Lynnwood, WA 98036-6365 <br /> 425-742-9360 <br /> Client Project <br /> Wilcox Construction Sunbelt Everett Wash Bay <br /> Attn: Sean Painter 7400 Hardeson Road <br /> 234 5th Ave S Everett, WA <br /> Edmonds, WA 98020-3425 <br /> Project Number: M7221748 <br /> Permit No. B2107-004 <br /> General Information <br /> Wilcox Construction requested Mayes/Terracon be on site for structural steel erection and bolt-up. Observed <br /> work was being performed by Wilcox Construction. The results of observation(s) for today were reported to <br /> Wilcox Construction. Mayes/Terracon representative arrived on site at 0700 and departed at 0930. <br /> The construction documents referenced for this inspection include HCl Steel Buildings LLC approved drawings by <br /> State of Washington engineer Brad Wallace dated 08/16/21. <br /> Summary of Services <br /> Verified bolted frame connections - galvanized A325 and GR-5 installed and tightened in accordance with <br /> Structural General Notes. Column anchor bolts were brought to snug-tight or better condition. Verified diagonal <br /> brace rod, nut end connection installation. Verified 26 mil gauge roof decking was screw fastened at 6" on center <br /> to Z-light gauge framing. <br /> Compliance Statement <br /> Based on our observations, construction activities at the above referenced locations appeared to be completed in <br /> general accordance with the project plans and specifications. <br /> Services: Special Inspections/ Materials Testing <br /> Mayes/Terracon Rep.: Todd Wirtz <br /> Reported To: Wilcox Construction <br /> Contractor: Wilcox Construction <br /> Report Distribution: <br /> (1)Wilcox Construction,Sean Painter (1)City of Everett WA,Permit Services <br /> (1)Mayes Testing Engineers,Inc, (1)Mayes Testing Engineers,Inc,Todd Reviewed By: <br /> Dnnna Pollard Wirt <br /> Kevin Graham <br /> Department Manager II <br /> The tests were performed in general accordance with applicable ASTM,AASHTO,or DOT test methods. This report is exclusively for the use of the client indicated above <br /> and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at <br /> the location(s)referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. <br /> DMO10,04-29-22 Rev.3 Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.