My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3625 RUCKER AVE 2025-06-23
>
Address Records
>
RUCKER AVE
>
3625
>
3625 RUCKER AVE 2025-06-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2025 9:18:00 AM
Creation date
2/14/2025 2:16:30 PM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
3625
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 of 24 <br /> PROJECT NO. SHEET NO. <br /> �•� S210527-3XR <br /> PROJECT 3625 Rucker Ave SE, Everett, WA, 98201 <br /> LONGITUDE SUBJECT Foundation Stabilization/Jacking <br /> ONE TWENTY N J 9/13/21 <br /> ENGINEERING DESIGN BY DATE <br /> Scope/Objective: <br /> To determine the required pile spacing and geometry to stabilize and lift(where required)the existing structural foundation. These <br /> findings have been based upon the calculated strength of the existing foundation system and the current vertical loading from the <br /> existing structure above(based on as-built assessments). <br /> The R&R Foundation Specialists'(R&R)proposed pile layout can be found in the following pages with structural recommendations <br /> based upon the findings of L120 Engineering&Design. <br /> Note that cosmetic damages to rigid wall coverings/members and siding are expected during a foundation lift. Such cosmetic <br /> damages/cracks are to be repaired by others following the completion of the foundation stabilization and lifting and are not included in <br /> the structural scope presented here. <br /> It should be further noted that L120's scope is limited to the perimeter support systems/continuous footings.The interior crawl-space <br /> support system for the first floor shall be installed per R&R. This could include the use of some or all of the following:longer support <br /> posts,adjustable post-base hardware,and/or the addition of taller wood support members. Settlement in these interior support areas <br /> shall be monitored and further adjustments shall be made if necessary. <br /> Structural Summary: <br /> -The foundation of the residence consists of continuous cast-in-place concrete strip footings with CMU stemwalls/full height first floor <br /> walls.Below the footings,piles are to be spaced at a distance no larger than 6'-0"on-center with the installation of L6x6x5/8 x 4'-0" <br /> angle iron segments,centered at each pile,at the locations indicated on the attached Level Survey.Reference SSK-01 and SSK-02. <br /> -End piles are to be placed as close to corners as possible and shall not exceed a max corner offset distance of 3'-0". <br /> -A maximum allowable loading of 3,700 plf was utilized in this analysis.This was determined through inspection of building geometry <br /> and conservative span/tributary loading assumptions based on standard construction practices <br /> - The following load values represent the maximum expected pile loads for the indicated spacing. R&R to provide pile and equipment <br /> assemblies with capacities equal to or greater than the indicated load values. <br /> Allowable Load Capacity Requirement: <br /> Exterior/Perimeter Piles @ 6'-0"o.c. ............ 22.5 kip minimum vertical capacity(allowable load) <br /> Note:Refer to the attached General Notes for additional requirements. <br /> - As determined by R&R,the site appears to have no lateral(horizontal)displacements or concerns. As such,the analysis and <br /> recommendations presented in this report have been strictly limited to vertical stabilization/jacking. If lateral movement is observed or <br /> expected additional structural analysis will be required. <br /> - Structural recommendations contained in this package are based on site photographs dated May 27,2021, provided by R&R.To the <br /> knowledge of L120,a geotechnical investigation was not performed on this site.Consequently,all structural recommendations assume <br /> adequate soil conditions to obtain the required pile capacities. <br /> Please inform L120 of site-specific conditions that were unconsidered by, may conflict with,or otherwise compromise the <br /> recommendations contained within this package,including,but not limited to,water drainage,slope stability,existing structural damage, <br /> or existing subsurface obstructions.In this instance,the structural assumptions,recommendations,and scope for this project will need <br /> to be revisited to consider and address the new findings <br /> Refer to the following pages for pile and connection specifications. <br /> L120 ENGINEERING St DESIGN <br />
The URL can be used to link to this page
Your browser does not support the video tag.