My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1822 BROADWAY 2025-03-24
>
Address Records
>
BROADWAY
>
1822
>
1822 BROADWAY 2025-03-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 10:32:34 AM
Creation date
2/18/2025 9:49:16 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
1822
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Completed By: W. PASCHAL <br /> Route Overview Completion Date: 12/23/2021 Address: 1824 BROADWAY EVERETT WA 98201 <br /> Survey Revision Date: <br /> ` Survey Revision Task ID: Footages Entered On Right of Way, Private Exterior, and Private Interior tabs. Footages `Lll = --- E <br /> Project <br /> For: are summarized on Survey Rollup tab.Manager: <br /> COMCAST 1 gject er: <br /> P2 ID: JB0000850904 Are Additional Pages Needed: No S <br /> Legend INSTALL ENCLOSURE - w <br /> New Ped ❑ Pole TO TRANSITION 96C 30'ATTACHING '4.r <br /> New vault Lock Box TO 12C FOC 2 TO STRUCTURE <br /> VI <br /> Existing U/G Z Footage POE DRILL THRU <br /> 150 <br /> Existing Aerial 86� BLOCK WAIL ice► <br /> PROVIDED TIE POINT <br /> Text Box Text - �" `1 rft" SP.WANE•0068 EV01S,2A.18 <br /> New U/G <br /> New Aerial Callout Arrow 1 , 48' " INSTALL TX 3' PLYWOOD NOT INSTALLED l <br /> 3 Interior Path New Tap & EQUIPMENT ON WALL TIE POINT @ <br /> , <br /> lI1 , <br /> avail aBLc i 10 vac. SP,WANE.0071_ <br /> Footage Break Phase Identifier ❑i "a *WW EV01S.ZA •''dl►Mc wi 123' <br /> Power Supply ft 11S�dr18 MfIA 1 <br /> Fiber Splice Point pp y PsA • —� <br /> WASNEVo10 ` � INSTALL STRAP <br /> Storage Loop Hard Surface Cut I CD OUT CASE <br /> Riser O Abandoned Cable - - 10' 1 <br /> 15R �• 11.8' <br /> Provide Clear Construction Details <br /> CIE - <br /> 1. TIE POINT AT AERIAL SP.WANE.0071_EV01 S.2A E 1 FLYING t <br /> (SP.WANE.0068 DOES NOT EXIST) 1� "`• �'1 - DU fCHMAN <br /> Ilk <br /> 123' ROW AERIAL 96C FOC DELASH / RELASH r , <br /> 0 <br /> - 123' ROW AERIAL 96C FOC DELASH / RELASH rM1'c�M <br /> - 199' ROW AERIAL 96C FOC DELASH / RELASH <br /> - 144' ROW AERIAL 96C FOC DELASH / RELASH I '� " WANED008C0 <br /> (FLYING DUTCHMAN) 10' SPAN TO POLE 1WW `' r wspnny„vw,w, <br /> - 198' ROW AERIAL 96C FOC DELASH / RELASH <br /> - 128' ROW AERIAL 96C FOC DELASH / RELASH <br /> -258' ROW AERIAL 96C FOC DELASH / RELASH �" • ,�c� <br /> - 111' ROW AERIAL 96C FOC DELASH / RELASH It <br /> - INSTALL ENCLOSURE TO TRANSITION 96C <br /> TO 12C FOC <br /> 2. 86' ROW TO PRIVATE EXT AERIAL 12C FOC .. <br /> -30' PRIVATE EXT 12C FOC ATTACHING TO <br /> STRUCTURE <br /> •�ti�N:»Mrtyh ,.. <br /> - POE DRILL THRU BLOCK WALL TO INTERIOR �t <br /> 3. 48' PRIVATE INT 12C FOC TO NETWORK DEMARC <br /> - INSTALL X X 3' PLYOOD ON WALL y <br /> - INSTALL EQUIPMENT ON WALL <br /> -AVAILABLE 110 VAC <br /> r. <br /> •r <br />
The URL can be used to link to this page
Your browser does not support the video tag.