Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 12/15/2023 12/15/2023 BLDG 08-FRAMING RAKEEB KHAN CORRECTION eTRAKiT Inspection Request <br /> REQUIRED <br /> Notes: <br /> 12/13/2023 8:01 PM MEGA CONSTRUCTION LLC <br /> Contact Name:MEGA CONSTRUCTION LLC <br /> Site Address:3405 ROCKEFELLER AVE UNIT B <br /> Phone:4255316555 <br /> e-Mail:hsbirk@gmail.com <br /> Stair landing framing missing hangers and dbl 2x8 per plans.Portion of new raised roof framing at stairs does not have minimum bearing.Fireproof all <br /> penetrations.Note:1 hour wall located at south side of building <br /> 12/20/2023 12/20/2023 BLDG 08-FRAMING RAKEEB KHAN CORRECTION eTRAKiT Inspection Request <br /> REQUIRED <br /> Notes: <br /> 12/19/2023 9:45 AM MEGA CONSTRUCTION LLC <br /> Contact Name:MEGA CONSTRUCTION LLC <br /> Site Address:3405 ROCKEFELLER AVE UNIT B <br /> Phone:4255316555 <br /> e-Mail:hsbirk@gmail.com <br /> Need mechanical permit.Duct work not installed.Mechanical rough in required prior to framing inspection. Previous corrections made. <br /> BLDG 09-FIRE CORRECTION <br /> 12/20/2023 12/20/2023 STOPPING/BLOCKIN RAKEEB KHAN REQUIRED <br /> G <br /> Notes: <br /> Need mechanical permit.Duct work not installed.Mechanical rough in required prior to fire stopping inspection. Previous corrections made. <br /> 12/20/2023 12/20/2023 BLDG 10-DRYWALL RAKEEB KHAN PARTIAL <br /> NAILING APPROVAL <br /> Notes: <br /> Exterior drywall at rated assembly <br /> 12/22/2023 12/22/2023 BLDG 08-FRAMING RAKEEB KHAN APPROVAL <br /> Notes: <br /> 425-319-6555 <br /> hsbirk@gmail.com <br /> BLDG 09-FIRE <br /> 12/22/2023 E <br /> /22/2023 STOPPING/BLOCKIN RAKEEB KHAN APPROVAL <br /> G <br /> Notes: <br /> I <br /> Printed:Tuesday, 18 February,2025 2 of 3 rk <br /> SUPERION <br />