My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3405 ROCKEFELLER AVE B 2025-04-17
>
Address Records
>
ROCKEFELLER AVE
>
3405
>
3405 ROCKEFELLER AVE B 2025-04-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 10:28:25 AM
Creation date
2/18/2025 11:01:34 AM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
3405
Unit
B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Drew Martin <br /> From: Drew Martin <br /> Sent: Wednesday, August 18, 2021 3:19 PM <br /> To: Harjeet Birk <br /> Subject: City of Everett Permit Services: 3405 Rockefeller Avenue#B (B2107-075) - First Building <br /> Intake Review <br /> Attachments: 2018 IRC_Typical Code References_04-12-2021.docx; City of Everett - Residential <br /> Drawing Preparation.pdf <br /> Hello, Mr. Harjeet. <br /> Your application has been received and a permit set up. However, the submitted documents are not sufficient <br /> for us to perform a review at this time. Construction-level documents need to be submitted for <br /> review. Information is attached to provide guidance. Preliminary comments are provided below to assist in <br /> preparing the drawings, but these are not intended to provide a comprehensive review. Depending on your <br /> experience with the model codes and preparing documents, we recommend consulting with a design <br /> professional to assist you. <br /> 1. The submitted documents include sketch-level drawings. Construction-level drawings should be <br /> submitted for review. The drawings should, include but are not limited to, floor plans for both levels of <br /> the house, details for the stair construction, and material requirements. The drawings should <br /> reference the current building codes. Note that the proposed project is in a four-unit residential <br /> building and must comply with requirements of the IBC. <br /> 2. The current work appears to be prompted by code enforcement action under File No. CE19-1106. The <br /> code enforcement documentation appears to include additional work is required that is not currently <br /> represented by the submitted documents. The code enforcement documentation should be reviewed <br /> and the drawings developed to address all identified issues. <br /> 3. The project involves a multi-family building. Details for fire-rated assemblies should be included in the <br /> construction drawings. <br /> 4. The project may involve structural modifications, which are required to be performed by a professional <br /> engineer licensed in the state of Washington. Structural drawings and calculations should be sealed <br /> and signed by the EOR. See RCW Sections 18.43.010, 18.43.020, and 18.43.070. <br /> Review of your project will be performed in the order received once the required documentation has been <br /> submitted. Please let me know if you have questions. <br /> — Drew Martin, P.E.,S.E. <br /> Associate Engineer—Commercial Plans Examiner I Permit Services <br /> 425.257.8810 13200 Cedar Street, 2nd Floor, Everett,WA 98201 <br /> EVERETT Phone Hours: M/W/T: 8 am - 12 pm & 1 pm—3 pm;Tu: 1:OOpm-3:OOpm <br /> everettwa.gov/permits I Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.