Laserfiche WebLink
ROOF <br /> GABLE END ROOF TRUSS AND NAILING NG PEREPLANNG m _ • - • <br /> 2X4 ROOF OUTRIGGER <br /> @ 24"O.C. GABLE END ROOF TRUSS BLOCKING @ In O b2engineers.com <br /> 2-ROOF OVERHANG ROOF TRUSS,SHEATHING EACH SUPPORT 425-318-7047(0) <br /> @ 24"O.C. AND NAILING PER PLAN 425-318-0031 (C) <br /> LTP4 CLIP @ SHEATHING LTP4 CLIP IF WALL SHEATHING H2.5 TIE TO EACH TRUSS <br /> BREAK,SEE SHEARWALL DOES NOT OVERLAP BLOCKING, <br /> SCHEDULE FOR SPACING LTP4 CLIP @ SHEATHING SEE SHEARWALL SCHEDULE @ EACH END <br /> BREAK,SEESHEARWALL <br /> FOR SPACING <br /> 2X4 TRUSS BRACES @ ROOF TRUSS,SHEATHING SCHEDULE FOR SPACING <br /> 24"O.C.(BY TRUSS AND NAILING PER PLAN <br /> TRUSS BRACES AT 24" <br /> SUPPLIER) (BY TRUSS SUPPLIER) HEADER PER SCHEDULE <br /> PRO VIDE THE PENING AND PROVIBELOW THE PENING AND - <br /> BELOW THE OPENING PER HEADER PER B/S-4 BELOW THE OPENING PER <br /> DETAIL C/S-4 DETAIL C/S-4 HEADER PER SCHEDULE <br /> 15/32"OSB OR PLY <br /> WALL SHEATHING,SEE 15132"OSB OR PLY <br /> 15/32"OSB OR PLY 2X6 STUD WALL @ 16"O.C. SCHEDULE FOR NAILING <br /> NG,SEE (TYPICAL AT EXTERIOR) WALL SHEATHING,SEE <br /> WALL SHEATHI <br /> SCHEDULE FOR NAILING ROOF RAFTERS,SHEATHING 2X6 STUD WALL @ 16"O.C. SCHEDULE FOR NAILING <br /> AND NAILING PER PLAN (TYPICAL AT EXTERIOR) <br /> LRUZ(OR SIMILAR) BLOCKING FLOOR JOISTS,SHEATHING <br /> HANGER TO EACH 2X8 LEDGER W/(2)4 1/2"LONG AND NAILING PER PLAN <br /> RAFTER SDS SCREWS @ EACH STUD <br /> ROOF RAFTERS,SHEATHING TENSION STRAP BLOCKING @ 24"O.C. FLOOR JOISTS,SHEATHING LVL RIM BOARD <br /> AND NAILING PER PLAN PER PLAN AND NAILING PER PLAN ?0 Bq <br /> IfFLOOR JOISTS,SHEATHING LTP4 CLIP@SHEATHING Q•C-OF WAS 19 <br /> AND NAILING PER PLAN BREAK,SEE SHEARWALL <br /> BLOCKING H2.5 TIE TO - - - PROVIDE H2.5 TIE TO EACH SCHEDULE FOR SPACING • Z <br /> EACH RAFTER RAFTER BOTH ENDS) BEAM PER PLAN TENSION STRAP <br /> ROOF BEAM 6X6 KNEE BRACE(AT ( <br /> PER PLAN CC (ECCQ AT EDGES) 45 DEGREE ANGLE) ROOF BEAMS PER PLAN PROVIDE HUCQ HANGER PER PLAN HEADER PER PLAN <br /> TO ROOF BEAM <br /> POST CAPL BLOCKING @ 24"O.C. KBS1Z KNEE BRACE ECCLRQ(OR ECCLLQ) 2X6 STUD WALL @ 16"O.C. GCy.URAL ENo�? <br /> LVL RIM BOARD STABILIZER(BOTH SIDES, 2'-0" POST CAP (TYPICAL AT EXTERIOR) 15/32"OSB OR PLY OVAL <br /> 6X6 KNEE BRACE HEADER PER B/S-4 TOP AND BOTTOM) SS/ p1G <br /> PER PLAN LT <br /> CLIP @SHEATHING <br /> BREAK,SEE SHEARWALL PROVIDE SRAP ABOVE AND BEAM STRAP WALL SHEATHING,SEE 2X6 STUD WALL @ 16"O.C. <br /> KBS1Z KNEE BRACE PROVIDE MSTC48B3 STRAP FOR BEAM SCHEDULE FOR NAILING (TYPICAL AT EXTERIOR) <br /> STABILIZER(BOTH SIDES, SCHEDULE FOR SPACING BELOW THE OPENING PER PER PLAN TO RIM ATTACHMENT @ EACH END <br /> TOP AND BOTTOM) DETAIL C/S-4 DRAINAGE AND FLOOR JOISTS,SHEATHING <br /> WATERPROOFING FLOOR JOISTS, AND NAILING PER PLAN <br /> BY OTHERS POST PER BEAM PER PLAN SHEATHING AND <br /> PLAN PROVIDE IUSJOIST <br /> HANGER NAILING PER PLAN LVL RIM BOARD <br /> PT POST PER PLAN 15/32"OSB OR PLY TO EACH JOIST <br /> WALL, <br /> SEE 41/2"LONG TIMBERLOK HOEDOWN STRAP <br /> ABU POST BASE W/5/8" SCHEDULE FOR NAILING SCREWS @ 8"O.C.STAGGERED I r PER PLAN FEDERAL AVE <br /> X 5 1/2"STRONG BOLT 2 LUS HANGER BLOCKING @ 24"O.C. <br /> HOEDOWN STRAP -2X6 PT SILL PLATE& CREATE BEAM POCKET IN PT SILL PLATE 2X6 PT SILL PLATE&5/8"X10"A.B. RESIDENCE <br /> FLOOR JOISTS, CONCRETE WALL @EACH END (BEYOND) WITH BP WASHER PER <br /> PER PLAN 5/8"X10"A.B.WITH BP <br /> PT DECK JOISTS SHEATHING AND WASHER @ 36"O.C. (3"MIN BEARING LENGTH) RETAINING WALL FOOTING .. SHEARWALL SCHEDULE <br /> 5/8"X5 1/2"STRONG- NAILING PER PLAN 2X6 STUD WALL @ 16"O.C. SIZE AND REINFORCEMENT EVE R ETT <br /> PER PLAN LTP4 CLIP,SEE SCHEDULE (TYPICAL AT EXTERIOR) PER SCHEDULE <br /> BOLT 2 @ 12"O.C.,— FOR SPACING SLAB ON GRADE AND <br /> _—III ABU POST BASE W/5/8"X 7" _ — <br /> _ STRONG BOLT 2 TO PREPARATIONS PER <br /> CONCRETE WALL 15/32"OSB OR PLY X6 PT SILL PLATE&-WX10"A.B. PLAN <br /> III— <br /> DRAIN ROCK- PROVIDE LVL RIM BOARD(2) WALL SHEATHING,SEE WITH BP WASHER PER SCHEDULE � <br /> 2X70 PT LED 8"O.C. SCHEDULE FOR NAIL GER 6"TIMBERLOK @ <br /> —I 2X6 PT SILL PLATE&5/'X10" STAGGERED ING DRAIN ROCK <br /> DRAI A.B.WITH BP WASHER PER 2"CLR -i i i <br /> III SHEARWALL SCHEDU -#4 @ 16'E.W. <br /> 2'CUR- #4HORIZO TALAT16" 71 — DRAIN III—I 3403 FEDERAL AVE, <br /> #'@,2"E.W. _ _ _ _ _--2 # o EVERETT,WA98201 <br /> RETAINING WAL _ { _ 2"CLR -III—III—III—PREPARAT ONS PERIAB ON GRADE DPLAfQ—III— (SOIL PREPARATIONS( -- — SOIL PREPARATIONS I� <br /> FOOTING SIZE AND — 9 I —III a <br /> REINFORCEMENT—I I I—III—III— `� - 8 ,III ,III ,III ,III ,III ,IIIhER NOTES ON S�1 —i 1' 4 1 1 ^i PER NOTES ON S-1-III—III—III— ( <br /> PER SCHEDULE — <br /> «, <br /> —I —I I—III—III—I I—t r Detail 2 Detail 3 <br /> - -I —I —I DRAIN R CK LAYER 3/8°=1'-0° 1/2"=1'-0° <br /> I—III—III—III—III—I 11 3 #4— I I—p8"6"- I fill I I—III 8- <br /> -I I I—I I -1 I I—III—I I— <br /> SOIL PREPARAAS�TIONS- II III—III—III— O FLOOR JOISTS,SHEATHING <br /> PER NOTES 1—III—III—WATER PROOFING—_ — _ - <br /> PERARCHITECTURAL— - S BON GRADE AND NAILING PER PLAN BEAMS PER PLAN <br /> III—III—III—III—III—III—III III III III I'1 I R PLAN LRUZ(OR SIMILAR)HANGER <br /> III III III III III III III III III III—I 1~ a TO EACH RAFTER 2X8 LEDGER W/(2)41/2"LONG <br /> III—III—III—III—III—III—III—III—III—III—III—I�� AT 12"E W SDS SCREWS @ EACH STUD <br /> BEAM STRAP <br /> —III—III— — III_ y, ROOF RAFTERS,SHEATHING PER PLAN BLOCKING @ 24"O.C. <br /> —III—III—I I—I IIMPORTANT NOTE:( I I I—III-DRAIN III— AND NAILING PER PLAN <br /> III—III—III—III— NEW FOOTING SHALL BE-III—III— _ H2.5 TIE TO FLOOR JOISTS,SHEATHING <br /> PLACED AT 45 DEGREE OR--— 7 _ PROVIDE IUS HANGER PROVIDE IUS HANGER <br /> —III—III—III—III DEEPER PROJECTION-III—III—III—I EACH RAFTER AND NAILING PER PLAN <br /> _ TO EACH JOIST TO EACH JOIST <br /> III—III—III—III—III—III—III—III—III—III—III—III p_—^ -- PROVIDE HHUS HANGER FOR <br /> �—III—III—III—III—III—III—III—III—III—III—III—I —I�,'-6" -g" ATTACHMENT <br /> III—III—III—III—III—III—III—III—III—III—III—III — I" ROOFBEAM 5 Detail DRAWING INFO <br /> 1-1 1 I—III—III—III-1 I —I I —III—I 11-1 —III-1 I I—I I I I I— PER PLAN PROVIDE HGUS48 BEAM LVL RIM BOARD WITH U 3/4"=V-0" <br /> HANGER PER PLAN HUCQ HANGER <br /> LTP4 CLIP @SHEATHING ISSUE DATE 08-24-23 <br /> n Detail 1 CCO(ECCLRQ FOR 2 BEAM BREAK @ 24"O.C. HEADER PER <br /> U 1/2"-1'4" CONDITION)POST CAP SCHEDULE X6PTSILLPLATE& ISSUED FOR PERMIT <br /> KBS1Z KNEE BRACE 6X6 KNEE BRACE 2X4 STUD WALL` <br /> STABILIZER(BOTH SIDES, PER PLAN @ 16"O.C. 'WASHER @ 6TO.C. <br /> TOP AND BOTTOM) PROJECT NO.22082 <br /> PT POST PER PLAN <br /> SLAB ON GRADE AND <br /> ABU POST BASE W/5/8' #4 @ 16" PREPARATIONS PER PLAN <br /> X51/2"STRONG BOLT ENGINEER BB <br /> CONCRETE WALL REVISION SCHEDULE <br /> WITH FOOTING - <br /> #3 NOSE BAR z=#a NO. DATE DESCRIPTION <br /> BLOCKING @ 24"O.C. III MSOIL PREPARATIONS 1 09-16-22 PILE REVISION <br /> LVL RIM BOARD -'-2 ?ER NOTES ON S-1 <br /> #3 AT 18"E.W.(MID-DEPTH) 2X70 PT LEDGER W/41/2" FLOOR JOISTS, Detail 6 <br /> III LONG TIMBERLOK SCREWS SHEATHING AND <br /> @ 6"O.C.STAGGERED NAILING PER PLAN 3/4"=1'-0" <br /> -III IIIII 1_° <br /> LUS HANGER PT DECKJOISTS <br /> III— PER PLAN 2X6 PT SILL PLATE& <br /> (IIIII /8"X10"A.B.WITH BP <br /> _ 2X10 PT LEDGER W/5/8"X 51/2" ASHER @ 36"O.C. <br /> STRONG BOLT 2 @ 12"O.C. <br /> DRAINAGE AND -a— II II SLOPE BY OTHERS (IIIII III RETAINING WALL <br /> — (FOOTING SIZE AND FRAMING- <br /> REINFORCEMENT- — <br /> II III III IIIpER3QHEDULE 111 III _ DETAILS <br /> I—III—III—III—III—III—III—III=III—I I —_ <br /> 111111111111111111111111111111111111111111111111IIIIIIIIIIIIIIIIIIIIIIIIIIII . <br /> 4 Detail4 C <br /> Copynght b2 Stmctuml Engineers 2008 <br />