Laserfiche WebLink
CHANGE ORDER # <br />Project (Procurement) Number: Small Works Roster Project Title: <br />LSWR 2024-103 Clark Park Temporary Construction Fencing <br />Description of Change: (Attach contractor change proposal and cost schedule) (Attach Price or Cost Analysis) <br />BUILDING/LOCATION: 2400 Lombard Avenue, Everett, WA 98201 <br />This change order extends the contract period by 154 days to allow for continued temporary fencing <br />for the ongoing construction of Small Works Roster project #2024-113 Clark Park Renovation and <br />Off-Leash Dog Area to continue without disruption. The temporary fencing provided under this <br />contract, 2024-103, was not installed until the Notice to Proceed for 2024-113 was issued in <br />November 2024. <br />The small works roster project is estimated to be completed around the end of May 2025. Therefore, <br />the temporary fencing must be around the site until the small works roster project is completed. <br />The changes described above result in the following adjustment(s) in price and contract time (in calendar days). <br />* Total Project Price Before this Change, <br />including tax $14,959.59 Contract Time & Completion Date Prior <br />to This Change 180 <br />Completion Date <br />Prior <br />12/28/2024 <br />* Net (Increase) or (Decrease) Resulting <br />from this Change, including tax +$0 Net (Increase) or (Decrease) Resulting <br />from this Change 154 <br />* Total Project Price, Including this <br />Change, including tax $14,959.59 Contract Time & Completion Date <br />Including This Change 334 <br />Completion Date <br />After <br />05/31/2025 <br />By signing below, the City of Everett and the Contractor agree that the Contract work shall be changed to the extent <br />described in <br />for all such changes, including all direct and indirect costs and impacts. The City of Everett and the Contractor further agree <br />that Contract time shall be adjusted to the extent shown above. This Change Order only changes the contract between the <br />City of Everett and the Contractor to the extent explicitly provided in this Change Order. Signatures on this change order <br />may be ink, scanned pdf signature, or other electronic means. <br />CONTRACTOR CITY OF EVERETT <br />Economy Fence Center <br />11709 Cyrus Way <br />Mukilteo, WA 98275 <br />City of Everett <br />802 E Mukilteo Boulevard <br />Everett, WA 98201 Date <br />Project Manager: <br />Division Manager: <br />Department Director: <br />Name & Title:Derek Smith, President City Attorney Template Approved as to Form 10.17.22 <br />Date:Mayor: <br />*WA Use Tax on materials included. WAC 458-20-171 <br />Attest: ___________________________ <br />Office of the City Clerk <br />0001 <br />Derek Smith <br />02/07/2025 02/10/2025